My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:42:41 AM
Creation date
9/6/2018 10:38:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />5 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Lake Towers Underground Utilities Conversion <br />Palm Beach <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Palm Beach <br />b. POINT OF CONTACT NAME <br />Patricia Strayer, P.E. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(561) 833-8827 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Kimley-Horn served the Town to perform the undergrounding of overhead utilities for this project near Bradley Place and Wells <br />Road. Kimley-Horn designed the conduit and pullbox infrastructure for the electric and cable utilities (telephone was already <br />underground in this location) along with providing easement acquisition assistance, utility provider coordination, and infrastructure <br />upgrade design services. Because this project was essentially an “island” of underground infrastructure, there was a need to <br />coordinate the end conditions for the north and south limits of the project. Ultimately, the rear easement power lines were removed <br />with the homes and condominium being served from new underground utility infrastructure. The project included the installation of <br />underground FPL, AT&T, and Comcast conduit, and associated transformers, vaults, pull-boxes, and handholes, etc. The project <br />also included paving restoration and site restorations. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Prime Consultant <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.