Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />6 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Capital Cascades Trail <br />Tallahassee <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Blueprint 2000 <br />b. POINT OF CONTACT NAME <br />Autumn Calder, AICP <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(850) 219-1065 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Kimley-Horn provided multidisciplinary services relating to the design of this greenway, including effective community participation <br />and consensus building; environmental evaluation; stormwater management; landscape and park amenities that provide a unifying <br />community concept; construction cost estimation; and greenway and trail connectivity improvements. This diverse project included <br />3,500 linear feet of box culvert (12’ x 9’ and 10’ x 9’), a 5-acre walled stormwater management facility, 6,000 linear feet of water line <br />improvements, 3,200 linear feet of 24-inch gravity sewer, 4,000 linear feet of 12-foot multi-use path, a playground, and other passive <br />hardscape recreational areas. This project was designed, permitted, and constructed in conjunction with the directly adjacent FAMU <br />Way Roadway Project by the City of Tallahassee. <br /> <br />The project was vetted through numerous public charrettes and the Blueprint Citizen Advisory Committee and Technical <br />Coordinating Committee to balance community needs and wants. The project corridor is located directly adjacent to Florida <br />Agricultural & Mechnaical University (FAMU). The FAMU and City of Tallahassee leadership teams were involved from the start-up, <br />planning, layout, design, sequencing, and construction scheduling. <br /> <br />Major overhead transmission lines were protected/relocated as <br />part of this project. All overhead distribution lines were relocated <br />underground, fiber, cable, and telephone line relocations were <br />coordinated, and safety pedestals with 911 connectivity were <br />designed along the multi-use trail. The project included major <br />sanitary sewer utility relocations that corrected aging <br />infrastructure and relocated utilities to align with improvements. <br /> <br />To help ensure the success of this project, Kimley-Horn worked with <br />Blueprint 2000 and the City of Tallahassee to accomplish these <br />objectives: <br />• Extensive public outreach—listening, understanding, and <br />incorporating neighborhood and other stakeholder desires <br />• Continuous internal and external communication <br />• Balancing of various project objectives to achieve win-win <br />designs while always keeping permitability/constructability in <br />mind <br />• Building on and refining stormwater quality/quantity models, <br />which will guide selection of effective and cost-efficient <br />system components <br />• Optimizing flood damage reduction and stormwater quality <br />treatment with environmentally enhancing and aesthetic <br />designs <br />• Investigating off-site storage opportunities and attenuating <br />the FAMU Way extension project <br />• Long-term, low-cost maintenance through design <br />• Efficiency in every step of the process and cost-effective <br />designs, recognizing that we are the stewards of the <br />taxpayer’s money and trust <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />Fort Lauderdale, FL <br />(3) ROLE <br /> <br />GIS/Prime Consultant <br />b. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Prime Consultant <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br /> <br /> <br />