My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 10:42:41 AM
Creation date
9/6/2018 10:38:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />7 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Town of Palm Beach Town Hall Square Streetscape and <br />Infrastructure Improvements <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Palm Beach <br />b. POINT OF CONTACT NAME <br />Patricia Strayer, P.E. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(561) 833-8827 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Kimley-Horn was selected for this historic fountain restoration and roadway beautification project within the heart of the Town’s <br />commercial corridor. This project required extensive coordination with the community, Landmark Commission members, and elected <br />officials prior to ultimate approval and construction. Phase I of the project included the restoration of the Mizner Memorial Fountain <br />that was originally constructed in 1929. This part of the project was partially funded by the state through a historic preservation <br />grant. Phase II of the project includes streetscape improvements consisting of landscaped nodes, decorative pedestrian crossings, <br />updated urban park landscaping that creates a public gathering area in the median of a roadway where the fountain feature resides, <br />modification of various underground utilities, replacement of sidewalks with decorative tabby concrete, and the introduction of many <br />landscaping and architectural elements throughout the area. Phase II will also be partially funded by the state through a historic <br />preservation grant and through private citizen donations. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br />West Palm Beach, FL <br />(3) ROLE <br /> <br />Prime Consultant <br />b. <br />(1) FIRM NAME <br /> <br />Kimley-Horn <br />(2) FIRM LOCATION (City and State) <br /> <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> <br />Prime Consultant <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.