Laserfiche WebLink
@��g <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />City staff is an integral part of the team. All projects will be developed in the most cost- <br />effective project scopes to achieve successful results. <br />Prior to beginning a project, CAS's team would meet with city staff to outline the project <br />scope, budget and timelines. CAS will communicate with city staff during each phase of the <br />project and make the necessary adjustments to meet the city's goals. <br />The CAS philosophy utilizes a phased approach towards assisting the city in problem solving <br />and for implementation of the project. Our project approach is follows: <br />PHASE I - PROJECT DEVELOPMENT AND PLANNING <br />• Meeting with city staff and subconsultants to fine tune project scope <br />• Develop a fee proposal to match the project scope <br />• Call for SUE design ticket to determine existing utilities in the project limits <br />• Contact all utility companies and communicate scope of project and city needs <br />• Finalize scope and proceed with a project kick-off meeting with city staff, <br />subconsultants and representatives of all utility companies, determine utility <br />coordinator for project team <br />• Provide schedule of values and preliminary costs to city <br />• Obtain all as-builts of existing utilities within project limits <br />• Utilize utility tracking management system to monitor project development <br />PHASE II - DESIGN ENGINEERING <br />• Prepare comprehensive survey of entire project limits <br />• Prepare necessary easement documentation to incorporate relocated utilities <br />• Provide utility 2D - 3D locates and incorporate existing utilities into survey base <br />file <br />• Perform site investigation of existing rear lot utilities and connections to <br />residential homes <br />• Perform soil borings and testing within project limits <br />• Coordinate with existing utility companies on project schedules and costs to <br />connect utilities from overhead system to underground <br />• Public outreach to homeowners to inform them of the delineation between city <br />and homeowner responsibilities <br />• Determine location of utility duct bank within Golden Shores <br />• Utilize all necessary design methods, establish design and permitting <br />requirements <br />• Prepare preliminary (30%) utility relocation, street lighting, drainage and roadway <br />improvements, and landscaping plan and cost estimate <br />• Dispense plans to all utility companies for recommendations <br />7777 Glades Road, Suite 410, Boca Raton, FL 33434 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 16 <br />