My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) <br />References and Past Performance Projects <br />Marina Park Restroom Project: Performed the geotechnical exploration/engineering on behalf of the <br />City for the proposed construction of a new restroom building. <br />2108 Water Main Improvements Project, Phase 1: Performed the geotechnical exploration/ <br />engineering on behalf of the City via Chen Moore and Associates for the various improvements to the <br />City's water main at 7 locations. <br />SFWMD C-14 Canal Crossing: Performed the geotechnical exploration/engineering on behalf of the <br />City via Chen Moore and Associates along Rock Island Road between NW 1st Street & Southgate <br />Boulevard. <br />Roadway Evaluation, NW 8th Street: Performed the geotechnical exploration/engineering on behalf of <br />the City via Chen Moore and Associates to evaluate roadway settlement evaluation. <br />Projects: <br />181
The URL can be used to link to this page
Your browser does not support the video tag.