My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach RFQ No. 18-08-01 | Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements (CCNA) <br />References and Past Performance Projects <br />Mr. Mario Lobato, Mr. Richard Ziel <br />Miami Dade County - Water and Sewer Department <br />3071 S.W. 38th Avenue <br />Miami, Florida 33146 <br />p: 786.268.5308 /786.268.5422 e: mvlob01@miamidade.gov;ZieR@miamidade.gov <br />Projects:Various Water & Sewer Projects (2018- 2013) <br />Nutting performed/performing the geotechnical exploration/engineering and/or our full scope of <br />construction material testing for the Pump Station Improvement Program (PSIP) consisting of managing <br />the upgrades to the MDWASD Wastewater Collection and Transmission System (WCTS) that includes <br />sanitary sewer collection system, pump stations and force mains upgrades. Additional projects include <br />the SDWWTP High Level Disinfection upgrades, Sludge Dewatering Facility expansion at SDWWTP, <br />emergency installation of 64-inch water main, South Miami High Water Treatment Plant, Alexander Orr <br />Underwater Treatment Plant, installation of 16-inch HDPE and 12-inch force main at Bear Cut Channel. <br />(Not a complete list for this time frame.) <br />Mr. Sean Compel <br />City of Miami c/o Stantec Consulting Services <br />901 Pone deLeon Boulevard, Suite 900 <br />Coral Gables, Florida 33134 <br />p: 305.445.2900 e: Sean.Compel@Stantec.com <br />Projects:Various Roadway Projects (2016 - 2018 time frame) <br />Nutting performed/performing the geotechnical exploration/engineering for multiple roadway <br />improvement projects including drainage & roadway improvements along Solana Road between <br />Crawford & Poinciana Avenues, drainage & roadway improvements along SW 60th Avenue & SW 83rd <br />Street, Kiaora Street roadway improvements, improvements along NW 18th Avenue from NW 3rd Street <br />to NW 1st Street. <br />Mr. Michael Jones, Director <br />City of Margate <br />6199 NW 10th Street <br />Margate, Florida <br />p: 954.972.6458 e: MAJones@margatefl.com <br />Projects:Varied (2018 - 2017) <br />Southeast Park Restroom Project: Performed the geotechnical exploration/engineering on behalf of <br />the City for the future demolition and replacement of existing one-story restroom building. <br />180
The URL can be used to link to this page
Your browser does not support the video tag.