Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for Each key person.) <br />19. RELEVANT PROJECTS <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />B.S., CIVIL ENGINEERING, FLORIDA STATE UNIVERSITYMAGNA CUM LAUDE <br />Ms. Martinetti has over fourteen years of engineering experience and is senior project manager for projects within many local municipalities. Her roadway design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the quality control process, and local agency program (LAP) coordination, including agency certification assistance. Mrs. Martinetti has the advanced maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and Local Agency Program (LAP) projects including Transportation Enhancement Program and Community Incentive Grant Projects (CIGP). Her project management experience also includes design and retrofit of parks, roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out. <br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL <br />2013-2016 2016 <br />(1) TITLE AND LOCATION (City and State) <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDFronton Blvd ImprovementsDania Beach, Florida <br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - $766,000 <br />Check if project performed with current firmX <br />2011-2017 2017 <br />(1) TITLE AND LOCATION (City and State) <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSage Beach CondominiumHollywood, Florida <br />Project Manager and EOR for civil site design for condominium complex located east of A1A on Hollywood Beach. Design and permitting included replacement of the water main, coordination to underground all utilities on Iris Terrace and Jasmine Terrace as part of the offsite improvements, drainage design including a closed system with wells and exfiltration trench as well as offsite roadway and drainage improvements on Iris Terrace, Jasmine Terrance and a portion of South Surf Road. The utilities were designed by the utility agency owner and given to CGA to draw onto one “utility relocation” sheet for coordination and layout of the multiple underground conduits and resulting handholes. Construction Cost - $22 Million, Professional Fees - $178,500 <br />Check if project performed with current firmX <br />2014-Present Ongoing <br />(1) TITLE AND LOCATION (City and State) <br />c. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDNova Drive Complete Streets Improvements ProjectDavie, Florida <br />Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and recently awarded for construction. A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town Engineer: Laura Borgesi (954) 797-1113. Construction Cost: ($6.9M), Firm Fees: $459,475 <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />JENNA MARTINETTI, PE ROADWAY ENGINEER 14 14 <br />PE FLORIDA NO. 69035 <br />92