Laserfiche WebLink
2011-2016 2016 <br />(1) TITLE AND LOCATION (City and State) <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSR 870/Commercial Blvd, FDOT District IVTamarac, Florida <br />Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing, signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016. <br />Check if project performed with current firmX <br />2013-2014 2014 <br />(1) TITLE AND LOCATION (City and State) <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDRickenbacker Causeway, Miami Dade County, Florida <br />In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected multiuse path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for the widened bridge and new multiuse paths <br />Check if project performed with current firmX <br />2013-2016 2016 <br />(1) TITLE AND LOCATION (City and State) <br />f. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDDavie Road Phase 1 Roadway ImprovementsDavie, Florida <br />Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan, ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town project on a County owned roadway. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />2015-2018 2018 <br />(1) TITLE AND LOCATION (City and State) <br />g. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDDavie Road Phase 2 Corridor EnhancementsDavie, Florida <br />Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design services for this federally funded project required close coordination with the FDOT and CEI team. <br />Check if project performed with current firmX <br />93