|
29CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Luis A. Cruz Miranda, PE Stormwater lead a. TOTAL b. WITH CURRENT FIRM
<br />21 2 months
<br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Pembroke Pines, FL
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Master of Science in Civil Engineer (Hydrology and Hydraulic) State of Florida – 69995 (PE) / Puerto Rico 15820 (PE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (10) YEAR COMPLETED
<br />Puerto Rico Aqueduct and Sewer Authority (PRASA) – Water Distribution System Optimization. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2007-2017 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Water Resources Engineer & Project Manager, Mr. Cruz was in charge of updating PRASA’s infrastructure maps, as well as building a hydraulic model
<br />based on existing condition, calibration of models and recommendation of alternatives to optimize the studied area. He was responsible for the pump
<br />station energy consumption reduction by adjustment of pressure sustaining valve to carry the pump to the maximum operational efficient and the
<br />installation of timers to limit the daily operational time. Mr. Cruz performed a mechanical, hydraulic & electrical evaluation of visited pump station, and
<br />was also responsible for the scheduling, deliveries and supervision of the project development, weekly meetings and the coordination with the Client.
<br />b. (1) TITLE AND LOCATION (City and State) (5) YEAR COMPLETED
<br />Puerto Rico Aqueduct and Sewer Authority (PRASA) – Puerto Rico Water Capital Improvement
<br />Program.
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2007-2012 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Water Resources Engineer for East Region Program for the Puerto Rico Aqueducts and Sewer Authority's Capital Improvement Program. Efforts included
<br />the planning and development of the Capital Improvement Plan for the region, conceptual designs, design management, environmental permitting, land
<br />acquisition, construction management, and facility start-up services, among others. The Program identified over 140 projects for the region, including two
<br />reservoirs.
<br />c. (1) TITLE AND LOCATION (City and State) (5) YEAR COMPLETED
<br />Puerto Rico Infrastructure Financing Authority (PRIFA) and Puerto Rico Aqueduct and Sewer
<br />Authority (PRASA) - PRIFA Northwest Regional Aqueduct & Distribution System & PRASA’s North &
<br />West Regions Programs
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2003-2008 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Puerto Rico Northwest Water Projects, Puerto Rico Infrastructure Financing Authority (PRIFA) - Worked on various projects for PRIFA Northwest
<br />Regional Aqueduct & Distribution System & PRASA’s North & West Regions Programs, including:
<br />• Improvement to Isabela Water Distribution System
<br />• Two New Water Filtration Plants at Isabela (5.0 mgd) and Culebrinas (5.1 mgd)
<br />• New WWTP at Utuado
<br />• New Sanitary Sewer Systems at Camuy and Aguada Municipalities
<br />Mr. Cruz was the Project Manager for design and construction phases, in charge of supervising structures and places, site surveying, structural,
<br />foundation, earth work cut & fill, piping, plumb sanitary & potable lines and other activities. He prepared proposals for bids, scheduling, and supervision
<br />project development, certifications for payments, change orders and weekly meetings. Mr. Cruz also handled the coordination with Government
<br />agencies.
<br />d. (1) TITLE AND LOCATION (City and State) (1) YEAR COMPLETED
<br />Puerto Rico Aqueduct and Sewer Authority (PRASA) – Valenciano Reservoir. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2003-2008 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project comprised the construction of a new dam and reservoir along the Rio Valenciano, which would inundate approximately 554 acres. The
<br />Valenciano reservoir would have a drainage area of approximately 14.5 miles2; its maximum storage volume available would be approximately 20,000
<br />acre-feet and yield an average of 14.4 mgd, with a maximum yield of 21.6 mgd. As Water Resources Engineer, Mr. Cruz was in charge of the hydrologic -
<br />hydraulic study to estimate the impact of the new reservoir in two existing bridges and one proposed bridge upstream the proposed dam.
<br />
|