Laserfiche WebLink
30CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jafet Torres Rivera Pump Station Lead a. TOTAL b. WITH CURRENT FIRM <br />13 <1 <br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc., Pembroke Pines, Florida <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science in Civil Engineering (BSCE) Florida Professional Engineer (PE) 80247; Puerto Rico PE 21163 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />10 & 30 Hours OSHA’s Training – Occupational Safety and Health; <br />Collage of Engineers and Land Surveyors of Puerto Rico (CIAPR); <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami-Dade County Water and Sewer Department Pump Station Improvement Program, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 - Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Assessment of existing sanitary sewer pump stations and engineering design (civil and mechanical) of pump station replacements. <br />Preparation of construction cost estimates and technical specifications. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />New York Rising Community Reconstruction Program, NY PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 - 2017 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Consultant. Performing independent cost estimates, and cost reasonableness reviews on design proposals. <br /> <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Puerto Rico Aqueduct and Sewer Authority Optimization and Water Loss Recovery Program, PR PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011-2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Hydraulic Manager. Assessment and modeling of water transmission and distribution systems in order to reduce water losses and energy losses in the North <br />Region of Puerto Rico, including 20 cities. Drinking water quality analysis and modeling to reduce water age and formation of disinfection by-products (DBP’s), <br />to conform EPA’s rules and regulations. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Municipality of Caguas and Municipality of Humacao, PR – Various Projects PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009-2011 2009-2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction Administrator. Construction supervision on various construction projects, including new buildings, bridges, wastewater sewer systems and street <br />improvements. Review of shop drawings and submittals, answer RFI’s, evaluate and recommend construction change orders and applications for payment, <br />attend meetings, procure permits <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Puerto Rico Housing Department, PR PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2008-2009 2008-2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project (Construction) Director. Serve as construction manager for various housing rehabilitation projects. <br /> <br />f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Puerto Rico Infrastructure Financing Authority, PR PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2005-2008 2005-2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction Inspector. Construction inspection on improvements (civil, mechanical and electrical) to the Supreme Court of Puerto Rico, and during <br />construction of a 2 MGD tertiary waste water treatment plant in Utuado, PR. Generate documentation as RFI’s, meeting minutes, change order and change <br />directives, and review contractor’s applications for payment for approval <br />