|
31CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />MarQuellus Bennett, MBA, P.E. Lead Engineer a. TOTAL b. WITH CURRENT FIRM
<br />9 4
<br />15. FIRM NAME AND LOCATION (City and State)CTS Engineering, Inc. Fort Lauderdale, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BSCE, MBA P.E. Florida
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />Microstation/Geopak, ASAD, ICPR, Cascade, HEC-RAS, AGI 32, Advanced MOT Certification, FDEP Stormwater Erosion and Sedimentation Control Inspector
<br />Training, FDOT Supervisor Academy, Certified Public Manager Levels 1-6, Certificate in Supervisory Management
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 6, Districtwide Safety Push Button Design Contract, Miami-Dade & Monroe Counties,
<br />FL
<br />PROFESSIONAL SERVICES
<br />On-going
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer/Lead Drainage Engineer - Project includes 30+ safety enhancement projects throughout Miami-Dade and Monroe Counties initiated by
<br />Traffic Operations Safety Studies. Projects includes addition of pedestrian signal and detectors, flashing beacon and signage improvements, signing & pavement
<br />markings upgrades, mast arm & signal head replacements, and the addition of guardrail.
<br />Size: Varies. Cost: Varies (involved 40+ safety improvement projects in a variety of locations)
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Flanigan’s Seafood Bar and Grill Restaurant Parking Lot Design, North Miami and Coconut Grove,
<br />FL
<br />PROFESSIONAL SERVICES
<br />On-going
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record - Projects included the development of Demolition Plans, Erosion Control Plans, Paving Grading & Drainage Plans, & Site Dimension Plans.
<br />Project also included drainage analysis and design of the site and a summary report for permitting. Primary responsibilities included the development of signed
<br />and sealed plans and the drainage analysis, design, and reports.
<br />Size: 1.5 Acres Combined. Cost: TBD
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 6, SR-5 (SW 2nd Ave/Street) Safety and RRR, Miami, FL PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer/Lead Drainage Engineer - Project includes lane reconfiguration, minor widening and signing improvements to enhance traffic maneuvers.
<br />Project also includes minor widening, milling & resurfacing, ADA upgrades, enhanced signing & pavement markings, signalization, and drainage improvements.
<br />Primary responsibilities include design of roadway and drainage and permitting aspects of the project.
<br />Size: 0.3 miles Cost: $1.4 million
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, I-95/I-595 Express Lanes Direct Connect, I-95 from Stirling to Broward Blvd.,
<br />Broward County, FL
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Traffic Control Engineer - Primary responsibilities included the oversight and quality control of the traffic analysis of detour routes as well as providing signed
<br />and sealed summaries of the analysis for 14 Interstate detours.
<br />Size: 8.5 miles Cost: $441 million
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, NW 19th Street Bike Lanes, Fort Lauderdale, FL PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer/Lead Drainage Engineer - Project includes widening, restriping, and/or repurposing of the outside through lanes to create 4’ bike lanes.
<br />Initial tasks required close coordination with the Broward MPO, FDOT, County, and City staff to finalize the project scope. Project also includes milling &
<br />resurfacing, ADA upgrades, enhanced signing & pavement markings, signalization, and drainage improvements. Primary responsibilities include design of
<br />roadway and drainage and permitting aspects of the project
<br />Size: 3.0 miles Cost: $1.4 million
|