Laserfiche WebLink
31CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />MarQuellus Bennett, MBA, P.E. Lead Engineer a. TOTAL b. WITH CURRENT FIRM <br />9 4 <br />15. FIRM NAME AND LOCATION (City and State)CTS Engineering, Inc. Fort Lauderdale, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BSCE, MBA P.E. Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />Microstation/Geopak, ASAD, ICPR, Cascade, HEC-RAS, AGI 32, Advanced MOT Certification, FDEP Stormwater Erosion and Sedimentation Control Inspector <br />Training, FDOT Supervisor Academy, Certified Public Manager Levels 1-6, Certificate in Supervisory Management <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 6, Districtwide Safety Push Button Design Contract, Miami-Dade & Monroe Counties, <br />FL <br />PROFESSIONAL SERVICES <br />On-going <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer/Lead Drainage Engineer - Project includes 30+ safety enhancement projects throughout Miami-Dade and Monroe Counties initiated by <br />Traffic Operations Safety Studies. Projects includes addition of pedestrian signal and detectors, flashing beacon and signage improvements, signing & pavement <br />markings upgrades, mast arm & signal head replacements, and the addition of guardrail. <br />Size: Varies. Cost: Varies (involved 40+ safety improvement projects in a variety of locations) <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Flanigan’s Seafood Bar and Grill Restaurant Parking Lot Design, North Miami and Coconut Grove, <br />FL <br />PROFESSIONAL SERVICES <br />On-going <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record - Projects included the development of Demolition Plans, Erosion Control Plans, Paving Grading & Drainage Plans, & Site Dimension Plans. <br />Project also included drainage analysis and design of the site and a summary report for permitting. Primary responsibilities included the development of signed <br />and sealed plans and the drainage analysis, design, and reports. <br />Size: 1.5 Acres Combined. Cost: TBD <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 6, SR-5 (SW 2nd Ave/Street) Safety and RRR, Miami, FL PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer/Lead Drainage Engineer - Project includes lane reconfiguration, minor widening and signing improvements to enhance traffic maneuvers. <br />Project also includes minor widening, milling & resurfacing, ADA upgrades, enhanced signing & pavement markings, signalization, and drainage improvements. <br />Primary responsibilities include design of roadway and drainage and permitting aspects of the project. <br />Size: 0.3 miles Cost: $1.4 million <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, I-95/I-595 Express Lanes Direct Connect, I-95 from Stirling to Broward Blvd., <br />Broward County, FL <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Traffic Control Engineer - Primary responsibilities included the oversight and quality control of the traffic analysis of detour routes as well as providing signed <br />and sealed summaries of the analysis for 14 Interstate detours. <br />Size: 8.5 miles Cost: $441 million <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, NW 19th Street Bike Lanes, Fort Lauderdale, FL PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer/Lead Drainage Engineer - Project includes widening, restriping, and/or repurposing of the outside through lanes to create 4’ bike lanes. <br />Initial tasks required close coordination with the Broward MPO, FDOT, County, and City staff to finalize the project scope. Project also includes milling & <br />resurfacing, ADA upgrades, enhanced signing & pavement markings, signalization, and drainage improvements. Primary responsibilities include design of <br />roadway and drainage and permitting aspects of the project <br />Size: 3.0 miles Cost: $1.4 million