Laserfiche WebLink
34CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Erik M. Alcantara, E.I. Pipeline Design a. TOTAL b. WITH CURRENT FIRM <br />3 1 <br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc. (Miami, Florida) <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science, Civil Engineering, Instituto Tecnologico de Santo Domingo <br />Florida Registered Engineer Intern, FDOT Intermediate Work Zone Traffic <br />Control Certification , FDEP Qualified Stormwater Management Inspector , <br />FDOT CTQP, Asphalt Paving Technician Level 1, FDOT CTQP, QC Manager <br />Autodesk AutoCAD Civil 3D Manhole Assessment Certification Program <br />(MACP), National Association of Sewer Service Companies (NAASCO) Pipeline <br />Assessment Certification Program (PACP), National Association of Sewer <br />Service Companies (NAASCO) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />Mr. Alcantara serves as the Communications Committee Chair and webmaster for the American Society of Civil Engineers Miami-Dade Branch. He has been an <br />active ASCE member since 2015, serving the Miami-Dade and Broward branches. Additionally, he has served in multiple events and committees, such as the <br />Engineering Encounters Bridge Design Competition and Field Day. <br />19. RELEVANT PROJECTS <br /> <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />MG3 Developer Group, LLC, Happy Hollow Charter School, Unincorporated Palm Beach County PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015-2016 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Staff engineer for the design of a 2,435-student private charter school located on a 22-acre parcel property north of Atlantic Avenue and west of Florida’s <br />Turnpike in unincorporated Palm Beach County. The school will be developed as two (2) schools, a lower school for elementary grades and an upper school for <br />middle and high school students. The amenities for this K-12 charter school include an equestrian trail, tropical fruit grove, soccer field, basketball courts, student <br />garden and secured bicycle storage. Offsite roadway improvements required for the development of the school include, widening of Lyons Road from 2 to 4 lanes <br />divided as well as right and left turn lanes and median openings. Intersection improvements are also included at Happy Hollow Road and Lyons. The project <br />consists of full site civil development including an onsite gravity sanitary sewer system, 4,300 LF of 4” force main and a private lift station (1,200 gpm), 4,900 LF <br />of 8” potable water main, 3,400 LF of 16” water main extension, fire suppression system, 3,500 LF of 20” reclaimed water main, surface water management <br />system, grading, pavement, sidewalks, pavement marking and signage, and SWPPP plans. Size: 22-acre parcel Cost: $38M <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />MG3 Developer Group, LLC, Oakmonte Village of Davie, Davie, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015-2016 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction management and engineering inspections for a Senior Care Facility with 199 units, located on an 9.0-acre parcel on Stirling Road. <br />The amenities for this facility include green areas, gazebos, and a walking path around an onsite pond. Project included the following site civil development: gravity <br />sanitary sewer, potable water main, fire suppression system, surface water management system, grading, pavement, sidewalks, pavement marking and signage, <br />and SWPPP plans. Mr. Alcantara performed the following engineering inspections for this project: water main pressure testing, sanitary sewer lamping, Florida <br />Limerock Bearing Ratio (LBR) testing, roadway certification, and NPDES Stormwater Pollution Prevention Plan. Size: 9-acre parcel Cost: $32M <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami-Dade County WASD, Pump Station Improvement Program (PSIP), Miami-Dade County, <br />Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016-2017 2016-2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a project engineer, Mr. Alcantara has assisted with the engineering analysis and design services for the inspection, rehabilitation, and design of multiple pump <br />stations for the Miami-Dade County Water and Sewer Department. The Pump Station Improvement Program (PSIP) consists of inspection, design, rehabilitation, <br />and construction of various wastewater pump stations and force mains within Miami-Dade County. The program provides county-wide sanitary and <br />environmental improvements. The pump station projects include PS 0449, PS 0609, PS 0147, PS 0331, PS 0440, and PS 0081. Size: TBD Cost: $1.5M <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami-Dade County WASD, Ocean Outfall Legislation Program, Task Authorization #29, Miami- <br />Dade County, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016-2017 2016-2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a project engineer, Mr. Alcantara is developing a Conceptual Design Report for the projects in the North District transmission and pumping system that are <br />necessary to meet the requirements of the Ocean Outfall Legislation (OOL) Compliance Plan. This CDR includes approximately 21,000 LF of 48-inch diameter force <br />main and approximately 1,500 LF of 36-inch diameter force main. Tasks completed include Data Review and Pipeline Project Analysis. <br />Size: 22,500 LF of sanitary sewer force mains Cost: $250,000