|
34CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Erik M. Alcantara, E.I. Pipeline Design a. TOTAL b. WITH CURRENT FIRM
<br />3 1
<br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc. (Miami, Florida)
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Bachelor of Science, Civil Engineering, Instituto Tecnologico de Santo Domingo
<br />Florida Registered Engineer Intern, FDOT Intermediate Work Zone Traffic
<br />Control Certification , FDEP Qualified Stormwater Management Inspector ,
<br />FDOT CTQP, Asphalt Paving Technician Level 1, FDOT CTQP, QC Manager
<br />Autodesk AutoCAD Civil 3D Manhole Assessment Certification Program
<br />(MACP), National Association of Sewer Service Companies (NAASCO) Pipeline
<br />Assessment Certification Program (PACP), National Association of Sewer
<br />Service Companies (NAASCO)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />Mr. Alcantara serves as the Communications Committee Chair and webmaster for the American Society of Civil Engineers Miami-Dade Branch. He has been an
<br />active ASCE member since 2015, serving the Miami-Dade and Broward branches. Additionally, he has served in multiple events and committees, such as the
<br />Engineering Encounters Bridge Design Competition and Field Day.
<br />19. RELEVANT PROJECTS
<br />
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />MG3 Developer Group, LLC, Happy Hollow Charter School, Unincorporated Palm Beach County PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015-2016 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Staff engineer for the design of a 2,435-student private charter school located on a 22-acre parcel property north of Atlantic Avenue and west of Florida’s
<br />Turnpike in unincorporated Palm Beach County. The school will be developed as two (2) schools, a lower school for elementary grades and an upper school for
<br />middle and high school students. The amenities for this K-12 charter school include an equestrian trail, tropical fruit grove, soccer field, basketball courts, student
<br />garden and secured bicycle storage. Offsite roadway improvements required for the development of the school include, widening of Lyons Road from 2 to 4 lanes
<br />divided as well as right and left turn lanes and median openings. Intersection improvements are also included at Happy Hollow Road and Lyons. The project
<br />consists of full site civil development including an onsite gravity sanitary sewer system, 4,300 LF of 4” force main and a private lift station (1,200 gpm), 4,900 LF
<br />of 8” potable water main, 3,400 LF of 16” water main extension, fire suppression system, 3,500 LF of 20” reclaimed water main, surface water management
<br />system, grading, pavement, sidewalks, pavement marking and signage, and SWPPP plans. Size: 22-acre parcel Cost: $38M
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />MG3 Developer Group, LLC, Oakmonte Village of Davie, Davie, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015-2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Construction management and engineering inspections for a Senior Care Facility with 199 units, located on an 9.0-acre parcel on Stirling Road.
<br />The amenities for this facility include green areas, gazebos, and a walking path around an onsite pond. Project included the following site civil development: gravity
<br />sanitary sewer, potable water main, fire suppression system, surface water management system, grading, pavement, sidewalks, pavement marking and signage,
<br />and SWPPP plans. Mr. Alcantara performed the following engineering inspections for this project: water main pressure testing, sanitary sewer lamping, Florida
<br />Limerock Bearing Ratio (LBR) testing, roadway certification, and NPDES Stormwater Pollution Prevention Plan. Size: 9-acre parcel Cost: $32M
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami-Dade County WASD, Pump Station Improvement Program (PSIP), Miami-Dade County,
<br />Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016-2017 2016-2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As a project engineer, Mr. Alcantara has assisted with the engineering analysis and design services for the inspection, rehabilitation, and design of multiple pump
<br />stations for the Miami-Dade County Water and Sewer Department. The Pump Station Improvement Program (PSIP) consists of inspection, design, rehabilitation,
<br />and construction of various wastewater pump stations and force mains within Miami-Dade County. The program provides county-wide sanitary and
<br />environmental improvements. The pump station projects include PS 0449, PS 0609, PS 0147, PS 0331, PS 0440, and PS 0081. Size: TBD Cost: $1.5M
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami-Dade County WASD, Ocean Outfall Legislation Program, Task Authorization #29, Miami-
<br />Dade County, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016-2017 2016-2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As a project engineer, Mr. Alcantara is developing a Conceptual Design Report for the projects in the North District transmission and pumping system that are
<br />necessary to meet the requirements of the Ocean Outfall Legislation (OOL) Compliance Plan. This CDR includes approximately 21,000 LF of 48-inch diameter force
<br />main and approximately 1,500 LF of 36-inch diameter force main. Tasks completed include Data Review and Pipeline Project Analysis.
<br />Size: 22,500 LF of sanitary sewer force mains Cost: $250,000
|