Laserfiche WebLink
35CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Gustavo A. Silva, EI SUE a. TOTAL b. WITH CURRENT FIRM <br />4 2 <br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc., Miami, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science, Civil Engineering, Florida International University <br />Florida Registered Engineer Intern, FDOT Temporary Traffic Control <br />Intermediate Certification , FDOT CTQP, Earthwork Technician Level 1, FDOT <br />CTQP, QC Manager, Autodesk AutoCAD Civil 3D NASSCO Pipeline Assessment <br />(PACP),NASSCO Manhole Assessment (MACP) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />Mr. Silva serves as a member of the American Society of Civil Engineers Miami-Dade Branch. He has been an active ASCE member since 2014, serving the Miami- <br />Dade Branch. Additionally, he has served in multiple events, such as the ASCE Steel Bridge Competition (Captain) and Field Day. <br />19. RELEVANT PROJECTS <br /> <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />E13-WASD-03 Pump Station Improvement Program (PSIP), Miami-Dade County WASD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014-2016 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a project engineer, Mr. Silva is providing engineering analysis and design for the rehabilitation and replacement of multiple pump stations for the PSIP (Consent <br />Decree Program). The project is consisting of existing pump station inspection, coordination of survey and geotechnical services, design of pump station <br />rehabilitation or replacement, design of connecting force mains, permitting, and limited construction services. The engineering work includes PS 0449, PS 0147, <br />PS 0331, FM 0592 (24-inch), PS 0440, PS 0336, PS-1026, PS-1065 and PS 0609. Size: Varies Cost: $1.5M <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Sanitary Sewer Evaluation Survey (SSES), Miami-Dade County Public School (MDCPS) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014-2015 2015-2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project manager for the evaluation of sanitary sewer system(s) of 24 county schools. The schools are required to be in accordance with Chapter 24 of the Miami- <br />Dade County Code (MDCC), that each privately and publicly operated sanitary sewer system needs to be evaluated on periodic basis. Each sanitary system <br />should implement a Sanitary Sewer Evaluation Survey (SSES) and if required a rehabilitation program, as stated by the U.S. EPA’s Sewer System. The SSES <br />involves a visual inspection, smoke testing the collection system and a flow test on the wet well pump/lift station. Size: Varies Cost: $500,00 <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />S.R. 907/Alton Road - 43rd Street to Bascule Bridge No. 870613, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014-2015 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project manager/geotechnical engineer, material testing responsible for improvements along S.R. 907 in Miami Beach. The <br />project includes widening Alton Road in various areas, new traffic signal mast arms, and Stormwater drainage improvements <br />that include temporary sheet piles/helical piles for pump stations. Size: 2.6 Miles Cost: $1.2M <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami-Dade County WASD, Ocean Outfall Legislation Program, Task Authorization #29, Miami- <br />Dade County, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015-2016 N./A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a project engineer, Mr. Silva analysis the pumping station on the North District Water Treatment Plant to determine the capacity of the existing pumps. This <br />project is to eliminate the existing Ocean Outfall from the treatment plant. Tasks completed include Data Review and Pipeline Project Analysis. <br />Size: 1,500 LF of sanitary sewer force mains Cost: $300,000 <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South Florida Water Management District Culvert Inspections, Miami-Dade County, Broward <br />County and Okeechobee County. <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016-2017 <br /> <br />2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As a Project Engineer, Mr. Silva supports the South Florida Water Management District (SFWMD) to inspect the removal and/or replacement of multiple aging <br />culvert in the South Florida area. In addition, Mr. Silva assisted in construction service and support with multiple crew within the South Florida Area (Miami-Dade, <br />Broward and Okeechobee). <br />Size: Varies. Cost: $2.0M <br />