Laserfiche WebLink
36CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jose Compres, PE Structural Engineer a. TOTAL b. WITH CURRENT FIRM <br />17 6 <br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc, Pembroke Pines, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S., Civil Engineering, B.S., Structural Engineering Professional Engineer - Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />North District Wastewater Treatment Plant – Headworks Improvements, Miami-Dade County <br />WASD <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Responsible for design of improvements to the Grit/Screening Headworks Facility structures within the NDWWTP. The project includes design of demolition of <br />existing equipment and building components, safety access modifications, equipment supports, and roof system improvements. The work also includes Services <br />during Bid and Award, and Engineering during Construction. <br />Size: TBD. Cost: $TBD <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />2015 Fire Escape and Enhanced Hurricane Protection Area Inspection, Broward County PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Specific Role. Responsible for inspections and certification reports for the 5-year re-certification of Enhanced Hurricane Protection Areas (EHPA) at twenty- <br />seven (27) Broward County Schools, and Biennial inspections and corresponding condition certification reports for three (3) school Fire Escapes. <br />Size: TBD. Cost: $TBD <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />North District Wastewater Treatment Plant – Primary/Secondary Clarifiers Miami-Dade County <br />WASD <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Responsible for facility condition assessments and development of basis of design reports (BODR) for dome replacement of primary clarifiers with a flat <br />corrosion resistant metal roof, and dome rehabilitation for secondary clarifiers. The condition assessment of the interior concrete structure of all clarifiers <br />provided additional BODR recommendations for concrete surface repairs and resurfacing with corrosion resistant coatings. <br />Size: TBD. Cost: $TBD <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />North District Wastewater Treatment Plant – New Electrical Building Miami-Dade County WASD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Engineer responsible for improving resiliency for sea-level rise and storm surge for critical operational facilities including electrical service and <br />controls. Commensurate with expansion of the electrical load capacity for operational improvements and ocean outfall compliance at the NDWWTP, preliminary <br />design of a new electrical building incorporated higher floor elevations above projected flood/ surge levels, improved operator safety features, and hurricane <br />hardening. <br /> <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Improvements for Pump Stations 301, 414, 415, 416, and 417, Miami-Dade County WASD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Responsible for facility condition assessments and development of basis of design reports (BODR) for improvements to wet-wells, pump rooms, ventilation <br />facilities, and for operator safety and hurricane hardness. The condition assessment of the interior concrete structure of all wet-wells provided additional BODR <br />recommendations for concrete surface repairs and resurfacing with corrosion resistant coatings <br /> <br />