37CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Arjen Bootsma, PE Mechanical a. TOTAL b. WITH CURRENT FIRM
<br />20 2
<br />15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc., Pembroke Pines, Florida
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />M.S., Mechanical Engineering, University of Twente, The Netherlands,
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />Professional Engineer Florida #54604
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />L-63N Canal ASR Well Rehabilitation Okeechobee County PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Engineer (mechanical, civil). The ASR (Aquifer Storage and Recovery) Well was built around 1990, and has been in service from 1991 through
<br />1992. Since then it has been abandoned, and all electrical equipment has been removed. Under this project the well system, which consists of a canal
<br />water intake pump, a water treatment pond and the injection pump will be rehabilitated, new motor control centers will be installed, all broken
<br />instrumentation will be replaced and additional water quality monitoring instruments and SCADA will be added. The purpose is to restore the well system to
<br />full operability..
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />East Re-Development Transmission and Distribution Water Main Improvements, City of
<br />Miramar, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Design Engineer. Responsible for the design and engineering of approximately 72,000 LF of 6” PVC water mains to replace outdated and undersized
<br />water mains and placement of fire hydrants to ensure full coverage throughout the eastern part of the City. The project is on-going.
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami-Dade County Wastewater Master Plan, Miami-Dade County Water & Sewer
<br />Department, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Mechanical Engineer. Mr. Bootsma as Mechanical Engineer provided services in an effort to develop Remedial Action Plans for approximately 350 Pump
<br />Stations. The recommended upgrades focused primarily on pump selection, secondarily on upgrades to the entire pump station and tertiary on force main
<br />system upgrades. The Remedial Action Plans will provide balanced upgrades to the entire sewer pumping and transmission system, so that each individual
<br />pump station will comply with regulatory requirements and that compliance system wide will maintained throughout the 20-year planning horizon.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Prop os ed 8-inch Water Ma in Design: Banos Court from Riviera Drive t o University
<br />Drive in the Cit y of Coral Gabl e s, Miami-Da de Water And Sewe r Department, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Design Engineer. Responsible for the design and engineering of approximately 2,200 LF of 8” water mains to replace outdated and undersized water
<br />mains and placement of fire hydrants to ensure full coverage. The project is on-going.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />JEA NW Regional Water Treatment Plant, Jacksonville, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Design Engineer. Responsible for the site design and approximately 2,400 LF of off-site, 24” transmission main for the WTP, Mr. Bootsma
<br />engineered the stormwater management for this site to comply with all applicable regulations of the FDEP and the SJRWMD and to maximize the use of
<br />the existing topography. The transmission main was placed along the future FDOT ROW to meet up with existing water distribution and transmission
<br />mains.
<br />
<br />
|