Laserfiche WebLink
38CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Simon Sainsbury, PE Electrical a. TOTAL b. WITH CURRENT FIRM <br />30 3 <br />15. FIRM NAME AND LOCATION (City and State)CES Consultants, Inc., Pembroke Pines, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S., Electrical Engineering, Florida Institute of Technology Professional Engineer Florida, Electrical <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />19. RELEVANT PROJECTS <br />a.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />South Florida Water Management District – Pump Station Tower Grounding Modifications PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record Senior electrical engineer responsible for design of microwave tower grounding systems to protect personnel and equipment in <br />accordance with current TIA/ANSI/EIA grounding standards at Pump Stations G-310, G-335, G-370 and G-372. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Lincoln Road Pump Station, West Avenue, City of Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record Senior electrical engineer responsible for design of Lincoln Road Strom Water Pump Station with three 20,000 GPM pumps, VFDs, Control <br />Panel, RTU/Telemetry and associated electrical equipment <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Everglades Restoration and Capital Project, West Palm Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record Senior electrical engineer responsible for design of STA-1E Pump Station communication equipment improvements to the tower, building <br />electrical and communication system grounding and bonding at Pump Stations S-319, S-361 and S-362 <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Three (3) Pump Ground Storage Tanks, City Water Plant Booster Station, Panama City, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2006 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Senior Engineer, Mr. Sainsbury duties included: PLC Control with HMI and SCADA, On/Off and Speed Control (PID) for three water pumps to maintain city <br />main water pressure using an above ground water storage tank, UL508 Control panel, generator backup, RTU, Ladder logic PLC code, Field debug/startup. <br />N/A <br />N/A