Laserfiche WebLink
39CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Eva Campello, P.E. Lead Engineer a. TOTAL b. WITH CURRENT FIRM <br />11 4.5 <br />15. FIRM NAME AND LOCATION (City and State) CTS Engineering, Inc. Fort Lauderdale, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BSCE P.E. Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />AGi32, Microstation, Geopak, Advanced MOT Certification, FDOT Supervisor Academy, Certified Public Manager Levels 1-3 <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 6, NW 7th Avenue Lane Repurposing and RRR, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Lead Engineer - Project includes repurposing of the outside through lanes to bike lanes with on-street parking. Project also includes milling & resurfacing, ADA <br />upgrades, enhanced signing & pavement markings, signalization, and drainage improvements. <br />Size: 0.6 miles Cost: $1.6 million <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, NW 19th Street Bike Lane, Broward County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Lead Engineer - Project includes widening, restriping, and/or repurposing of the outside through lanes to create 4’ bike lanes. Initial tasks required close <br />coordination with the Broward MPO, FDOT, County, and City staff to finalize the project scope. Project also includes milling & resurfacing, ADA upgrades, <br />enhanced signing & pavement markings, signalization, and drainage improvements. <br />Size: 3.0 miles Cost: $1.4 million <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, Districtwide SIS Program Support, Broward, Indian River, Martin, Palm Beach and <br />St. Lucie Counties, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-going N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Lead Engineer - Provide comprehensive planning and engineering services to FDOT District 4 Strategic Intermodal System (SIS). Lead the tasks of performing <br />project needs identification, concept development feasibility, design plans, cost estimates, field reviews, and permit connection reviews on SIS corridors. <br />Size: Varies Cost: Varies <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, SR-70/Okeechobee Road Widening and Reconstruction, Fort Pierce, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Lead Signing and Pavement Marking Designer - Project included the widening/reconstruction SR-70 (urban arterial) from 900’ West of Jenkins Rd to 2,000’ <br />East of Jenkins Rd (0.55 Miles) in St. Lucie County, FL. Primary responsibilities included Lead Designer for all Roadway and Signing & Pavement Marking Plans. <br />Size: 0.59 miles Cost: $4.6 million <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FDOT District 4, SR-7 Widening and Reconstruction, Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Lead Designer - Project included the widening/reconstruction SR-7 (urban arterial) from Fillmore Street to just south of Stirling Road (2.08 Miles) from 4-lanes <br />to 6-lanes in Broward County, FL. Lead Designer for all Roadway and Signing & Pavement Marking Plans. <br />Size: 2.08 miles Cost: $29.6 million <br />