|
40CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01
<br />CES CONSULTANTS | RFQ 476-11906
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Brent Lee Shue Ling, P.E. Lead Engineer a. TOTAL b. WITH CURRENT FIRM
<br />13 1
<br />15. FIRM NAME AND LOCATION (City and State)CTS Engineering, Inc. Fort Lauderdale, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BE P.E. Florida
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards)
<br />Microstation, Geopak, Advance MOT Certification, Advanced MOT Trainer Certification, Pavement Design, FDOT Supervisor Academy, FDOT Management
<br />Academy, FDOT Leadership Academy
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, SR-838 Sunrise Blvd. Bridge Reconstruction, City of Fort Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2013 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Lead Designer & Assistant PM for all roadway and signing & pavement marking plans - This project utilized FDOT’s temporary detour acrow panel bridge
<br />for maintenance of traffic, and involved extensive coordination with environmental permitting agencies, utility owners, business owners, local agencies, and the
<br />public.
<br />Size: 0.25 mi. Cost: $10 M
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, SR-A1A Washout Reconstruction, City of Fort Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager FDOT In-House Section 2 - Features designed and installed included a promenade to the east side of the road adjacent to Fort Lauderdale
<br />Beach, comprising of brick pavered walkways, shower areas, a decorative wave wall with beach entrances, decorative sea turtle friendly lighting, on-street
<br />parking, bike lanes, bike racks, sand dune restorations and landscaping.
<br />Size: 1 mi. Cost: $13 M
<br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, SR-7 Mobility Improvements, Various Cities in Broward/Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Engineer of Record FDOT In-House Section 2 - Installed enhancements along a 12.5 mile stretch of SR-7 from Commercial Blvd. in
<br />Broward County to Glades Road in Palm Beach County. Enhancements included widening for buffered bike lanes, shared use paths and sidewalks, bus stop
<br />amenities, signalization upgrades to detection/communication, and lighting retrofits.
<br />Size: 12.5 mi. Cost: $25 M
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, SR-804 Intersection Improvement, City of Boynton Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Engineer of Record FDOT In-House Section 2 - This project replaced existing strain poles with mast arm signals at the intersection of
<br />SR-804/Boynton Beach Blvd. and Winchester Park Blvd. in Palm Beach County. Enhancements also included resurfacing, sidewalk, curb ramp, and lighting
<br />upgrades. This project involved right of way acquisition and extensive coordination with business owners, local agencies and utility companies.
<br />Size: 0.1 mi. Cost: $700 K
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />FDOT District 4, Old Dixie Highway Complete Streets, City of Fort Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Engineer of Record FDOT In-House Section 2 - The features designed and installed in this project included mid-block raised
<br />crosswalks, raised intersections, a roundabout, horizontal curve realignment, green bike lanes, sidewalks, pedestrian lighting, bio-swales, landscaping and
<br />neighborhood monuments.
<br />Size: 0.9 mi. Cost: $3 M
|