My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />CES CONSULTANTS | RFQ 476-11906 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Leonid (Alex) Melguizovski, CPCM Construction Management a. TOTAL b. WITH CURRENT FIRM <br />24 <1 <br />15. CES Consultants, Inc. Pembroke Pines, FL CES Consultants, Inc. Miami, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Science in Construction Management - Florida International <br />University, Bachelor of Science in Civil Engineering - Florida International <br />University, Associate in Arts in Civil Engineering - Miami Dade Community <br />College <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards) <br />ACI Certified 30 hours for OSHA. <br />Publication (cost control of a large sanitary sewer rehabilitation program) <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Construction of New Concourses and Infill (AB, BC, CD, D Extension and Regional <br />Commuter Facility), Aprons and Fuel System, Miami International Airport <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />•Monitored the latest issued schedule of heavy civil work and building construction activities with actual site progress. <br />•Monitored NOVs (Notices of Violation). <br />•Managed and tracked daily Time and Material Reports to confirm accuracy of T&M Daily Billings. <br />•Monitored the latest issued schedule of heavy civil work and building construction activities with actual site progress. <br />•Monitored NOVs (Notices of Violation). <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Construction of New Concourses and Infill (AB, BC, Cd, D Extension and Regional Commuter <br />Facility), Aprons and Fuel System, Miami International Airport <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />•Responsible for the preparation of schedules in Primavera (P6), cost and resource load and setup logic. <br />•Review and analyze contractor change requests with the associated costs and time extension requests <br />•Perform Program Schedule functions such as interacting with Project Managers and Contractors concerning project status, schedule updates, and <br />changes. <br />•Review contractor’s installation curves and utilization reports for all heavy civil work construction. Maintain and update the Overall Program Schedule <br />and evaluate contractor physical progress. <br />•Prepare and distribute schedule reports to MDAD and Contractor’s Project Managers. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Construction of New Concourses and Infill (AB, BC, CD, D Extension and Regional Commuter <br />Facility), Aprons and Fuel System, Miami International Airport <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />•Prepared schedules in Primavera, breakdown of activities and setup logic. <br />•Performed Program Schedule functions such as interacting with Project Managers concerning project status, schedule updates, and changes. <br />•Performed data transfer between various applications to keep schedule data updated. <br />•Maintained and updated the Overall Program Schedule. <br />•Prepared, printed and distributed schedule reports to American Airlines and POJV (Parsons-Odebrecht Joint Venture) Project Managers for monthly <br />status reporting. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Construction of Concourse A, FAA Control Tower and Terminal Extension North Phase 3, <br />Miami International Airport <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2000 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />•Set up Cost Codes and Budgets and issued cost code scopes. <br />•Monitored and reported progress reports. <br />•Kept complete records of changes to the project. <br />•Worked closely with Project Manager and Superintendent for proper coding and overruns. <br />•Monitored costs between outlooks and immediately advise PM of any decision that had a significant cost impact.
The URL can be used to link to this page
Your browser does not support the video tag.