Laserfiche WebLink
76CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />1. Project Title: WASD PS 449 Upgrades <br />2. Project Location: Miami Gardens, FL <br />3. Project Description: The Miami-Dade County Water <br />and Sewer Department (WASD), in an effort to comply with the <br />2013 Consent Decree and improve operations of its wastewater <br />collection system, established the Pump Station Improvement <br />Program. Under this program, WASD will repair or replace over <br />140 existing and non-compliant wastewater pump stations. The <br />improvements vary from pump upgrades to complete pump <br />station and force main upgrades. <br />CES, as one of the design consultants, was tasked to analyze <br />and design the improvements for PS 449. This station was a <br />submersible station, but the wet well was undersized in both <br />diameter and depth. The new design included a new 8-foot <br />diameter wet well and valve vault, new 21.5 HP pumps, 10- <br />inch diameter discharge piping, approximately 250 feet of <br />10-inch force main, modifications to the two existing receiving <br />manholes, and a new electrical control panel. The design <br />included demolition plans, civil site plans, mechanical plans, <br />structural plans, and electrical plans. The new layout allows <br />for a better use of the site, which includes the installation <br />of the upgraded pump station and a parking pad for WASD <br />maintenance vehicles or a temporary generator. Our team <br />provides full design services, which includes surveying, <br />geotechnical engineering, civil engineering, mechanical <br />engineering, structural engineering, and electrical engineering. <br />The main complexities of these projects and designs are the accelerated schedules required to meet the Consent Decree schedules. <br />The aggressive schedule requires efficient project management and effective project controls. <br />4. Owner’s Contact Name and Address: Miami-Dade County Water and Sewer Department (WASD), 3071 SW 38th Avenue, <br />Miami, Florida 33146. <br />Contact Person/Phone No.: Reinaldo Rivera, PE / 305-446-7450 <br />5. Project Duration (Dates): 4/2015-4/2016 <br />6. Was the project completed within schedule? Yes <br />If not, what was the original completion date? <br /> 7. Location of office performing work: Pembroke Pines <br /> 8. Was applicant the prime firm, or Subconsultant firm? Prime <br /> 9. Was work performed in-house? Yes <br /> 10. Type/Scope of services provided? Civil Engineering, Structural Engineering, Mechanical Engineering, Electrical <br />Engineering, and Construction Phase Services <br /> 11. Names of key team personnel for this project? Jose Caraballo, PE; Engineer of Record, Ranthus Fouch, PE; QC <br />Review <br /> 12. Which members of your proposed team worked on this project? Jose Caraballo, PE, Ranthus Fouch, PE