My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:25:27 PM
Creation date
12/11/2018 1:07:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />Project <br />Status <br />Responsible <br />Office Project Name Project Client <br />Active West Palm Beach Staffing and Budgeting for Biosolids and AWT Plant <br />Operations at ECRWRF Brown & Caldwell <br />Active West Palm Beach Washington Road Utility and Stormwater Outfall <br />Improvements City of West Palm Beach <br />Active West Palm Beach Professional Eng. Services for Ops, Maintenance, Repair, <br />Replacement & Rehab EAC Consulting, Inc. <br />Active West Palm Beach BBCW L31E CULVERTS Inspection and Material Testing Services Brown & Caldwell <br />Active West Palm Beach WPBFS Culvert Replacement Project A.D.A. Engineering, Inc. <br />Active Miami Local Pump Stations (WASD)Miami-Dade County Water and Sewer <br />Department (WASD) <br />Active PM / CM Baggage Handling System at Miami International Airport Parsons Odebrecht JV <br />Closed PM / CM CPM for Expansion Runway 9R-27L FLL Parsons <br />Closed PM / CM Support to the Explosive Ordinance Disposal Group One <br />(EODGRU-1)NAVSUP FLC JACKSONVILLE <br />Closed Miami MDWASD Hialeah Preston GWUDI Upgrades WTP And NW <br />Wellfields Carollo Engineers <br />Closed Miami South District Wastewater Treatment High Level Disinfection <br />Facility AECOM <br />Closed West Palm Beach Full Service Engineering - Everglades Compartment C Carollo Engineers <br />Closed PM / CM PM for FLL Terminal One Modernization (Southwest)Parsons <br />Closed Miami East-Redevelopment Transmission and Distribution Water <br />Main Improvements City of Miramar <br />Closed PM / CM Construction Management @ Risk for Terminal 4 Gate <br />Replacement Cummings-Balfour Betty <br />Closed West Palm Beach SFWMD Everglades Restoration Staff Augmentation Jordan Jones & Goulding <br />Closed West Palm Beach SFWMD Everglades Restoration and Capital Projects Resources <br />Area Support Jordan Jones & Goulding <br />Closed West Palm Beach SFWMD Everglades Restoration Area Technical Reviews Jordan Jones & Goulding <br />Closed Miami Equitable Distribution Program Continuous Professional <br />Services Agreement <br />Miami-Dade County Department of <br />Transportation and Public Works <br />Closed PM / CM Owner's Rep Ravenswood Maintenance Facility AMEC Foster Wheeler <br />Closed West Palm Beach Lake Side Ranches Construction Engineering AMEC Foster Wheeler <br />Closed Miami Professional Cost Estimating Services Consultant US Cost <br />Closed Miami Marlins Ballpark URS Corporation <br />Closed Miami Proposed Upgrades to the Central District Wastewater <br />Treatment Plant Montgomery Watson & Harza, Inc. <br />Closed Miami SFWMD Fall Protection Program Tetra Tech EC, Inc. <br />Closed Miami Jacksonville Office Construction and Engineering Services <br />Closed Miami Construction Oversight Project with Atkins for MIA AirportLink Atkins <br />Closed Broward R1090025P1 Retail Potable WWW Master Plan CDM Smith <br />Closed Miami Anion Exchange Treatment Facility CDM Smith
The URL can be used to link to this page
Your browser does not support the video tag.