Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br /> KEY NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />WPB WTP Hypochlorite Conversion Project <br />West Palm Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2011 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />City of West Palm Beach Dick Verduin, Plant Manager 561-835-7400 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />AGA worked with the Prime Consultant to convert the treatment process from chlorine to hypochlorite. <br />The project included modifications to existing Chlorine Building; a new Metering Pump Building; and <br />new Day Tank Foundation and Secondary Containment. <br /> <br />Structural Design included checking existing structure for new loads, new wall and ceiling openings and <br />support for new process equipment. All work was performed while the plant remained in operation. <br /> <br />AGA provided structural engineering services from design through construction administration. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br />Alan Gerwig & Associates, Inc. Wellington, Florida Structural Engineering. <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br /> <br />Alan Gerwig & Associates, Inc. STANDARD FORM 330 (REV. 3/2013) <br /> <br /> <br />124