My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br /> KEY NUMBER <br />3 <br /> <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PBCWUD Water Treatment Plant 3 – Degasifier No. 3 & Odor Scrubber <br />Palm Beach County, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014/2015 2015 <br /> <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />Palm Beach County Water Utilities <br />Department Steve McGrew, P.E. 561-493-6000 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />Alan Gerwig & Associates (AGA) provided structural engineering services for this project through <br />Calvin Giordano & Associates and Cardinal Construction as part of the Design-Build Contract with <br />Palm Beach County Water Utilities. <br /> <br />AGA analyzed the existing raised slab for the addition of the third degasifier and designed the <br />equipment pad and anchoring for the new degasifier and blower housing on the raised slab. AGA also <br />designed a new opening in the wall under the degasifier and provided specifications for the other <br />incidental equipment such as ladders, walkways, etc. <br /> <br />In addition, AGA designed a slab on grade and anchoring for the replacement odor scrubber, which <br />was constructed as part of this project. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br />Alan Gerwig & Associates, Inc. Wellington, Florida Structural Engineering Services <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION(City and State) (3) ROLE <br /> <br />Alan Gerwig & Associates, Inc. STANDARD FORM 330 (REV. 3/2013) <br /> <br /> <br />125
The URL can be used to link to this page
Your browser does not support the video tag.