My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach RFQ No. 18-11-01 | Consulting Engineering Services for Golden ShoresPump Station Rehabilitation (CCNA) <br />PAST RECORDCGA has extensive experience in providing consulting services on a continuing basis to municipal clients. We are currently under contract with over 60 governmental entities - many for over 20 years - demonstrating that we continually provide sustainable high quality services. Client satisfaction remains our underlying theme and is the most important part of any statement on past performance. <br />As noted previously and detailed out in the projects section, CGA has recently completed pump station, SCADA and emergency generator designs as part of the Lloyd Estates Pump Station, Hallandale NE Quadrant Drainage project, the Meadowbrook Pump Station Rehabilitation project, and the Halalndale SW Drainage Improvements Projects, all of which have similar components to the Golden Shore Pump Station Rehabilitation Project. <br />CGA has assisted the City with a number of projects in recent years, including Construction Administration of the Newport Beach Pier, Design and Construction Services for the North Bay Road Pedestrian Bridge, evaluation of the this pump station, 174th Street Roadway Improvements, lighting studies at 174th Street and throughout the Golden Shores Neighborhood, city-wide speed studies, traffic engineering services, and engineering plan review services. <br />Through our prior involvement with the City, we are familiar with the Golden Shores neighborhood and its roadways and drainage system. <br />PROJECTS EXPERIENCEPlease reference the Standard Form 330 and Projects section. <br />FINANCIAL STABILITYCGA is a financially stable company with the resources to ensure continued operations throughout the duration of the contract. A copy of our audited financial statement in the past three (3) years is included at the end of this section. <br />SIZE OF WORK FORCECGA maintains a workforce of over 350 professional staff. The workforce proposed for this project is identified in the organization chart and resumes in the SF330 form included at the end of this section. <br />17
The URL can be used to link to this page
Your browser does not support the video tag.