My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br />GOLDEN SHORES PUMP STATION REHABILITATION (CCNA) <br />RFQ 18-11-01 <br />16 <br />to prepare the “As-built” plans to be submitted to the City. Our geotechnical sub-consultant, Nadic Engineering Services will evaluate the existing geotechnical data and will make recommendations regardign the need for any additional data. At a minimum, the geotechnical investigation will identify soil types, soil characteristics and properties and provide geotechnical recommendations for engineering design, and ground water table elevation. <br />Design Phase <br />We will start the pump station design as soon as we receive the NTP from the City. The engineering drawings and specifications will be refined to include specific equipment, layouts, mechanical, electrical, structural, instrumentation and controls, and SCADA. The engineering documents and technical specifications will be presented to City’s staff for review and comments. Our team members will develop with the City an efficient procedure to carry out this review. We will be available for a design review with the City staff to go over the submittal and obtain comments from staff. The comments will be incorporated in the plans and at 60%, the plans are submitted to the permitting agencies for permit review and approval. Then, the pump station design will be advanced to the 90% level of completion. This level of completeness will include a more refined specific equipment, layouts, mechanical, electrical, structural, instrumentation and controls, and SCADA sufficient to allow the contractor to build the project. The 90% engineering documents and technical specifications will be presented to City staff for review and comments. After their review, their comments will be incorporated in the 90% plans. This task results in the preparation of complete design documents pending receipt of permitting documents. Once permit activities are completed, any changes to the drawings and specifications required for approval by the permitting agency will be incorporated into the engineering drawings and specifications. Thereafter, 100% signed and sealed construction plans will be finalized and submitted to the City electronically as well as hard copies to allow the commencement of construction. <br />Contract Documents <br />The APCTE Team will prepare a set of contract documents in compliance with the specifications established by the City of Sunny Isles Beach. In addition, all materials and workmanship shall meet the requirements of the latest editions of the following publications: <br />1. Miami-Dade County Public Works Manual “Design and Construction Standards;2. The Florida Department of Transportation “Standard Specifications for Road and Bridge Construction, and its supplements;3. The Florida Department of Transportation “Standard Plans for Roadway and Bridge Construction”;4. The Florida Department of Transportation “Structures Standards”;5. Miami-Dade Water and Sewer Department “Design and Construction Standard Specifications and Details”; and <br />Permitting <br />The APCTE Team has over 20 years of experience in procuring and obtaining Right-of-Ways (R/W) and permits within the Miami-Dade County and its Municipalities and regulatory agencies. We are intimately familiar with the permitting procedures, requirements and typical timeframes to obtain permits approval. Our approach for permit procurement is to provide early coordination with every applicable agency, including pre-permit review meetings and post-submission peer review meetings to facilitate permit approval, specifically within the City of Sunny Isles Beach.
The URL can be used to link to this page
Your browser does not support the video tag.