My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Similar Project Experience <br />This Design-Build Project included the installation of (2) Storm Water Pump <br />Stations at the street end of 14th & 10th street along Biscayne Bay. Projects <br />included the installation of wet well approximately 25’ in depth, drainage <br />defender box, grate box, valve vault, dissipator box and all miscellaneous <br />piping. Installation was performed in a tight corridor at the street end of 14th <br />& 10th Street along Biscayne Bay. <br />CLIENT NAME City of Miami Beach <br />LEAD DESIGNER A&P Consulting Transportation Engineers, Corp. <br />PROJECT DURATION August 2015 / October 2015 <br />CONSTRUCTION VALUE $1,600,000.00 <br />LUIS SOTO, P.E. <br />(305) 673-7000 EXT: 6924 <br />luissoto@miamibeachfl.gov <br />Pump Station at 14th & 10th Street, City of Miami Beach, Florida <br />CO <br />N <br />T <br />A <br />C <br />T <br />KEY PERSONNEL <br />Arnelio Alfonso, P.E., Lazaro Ferrero, P.E., Angela Baron-Ruiz, P.E., Antonio G. Acosta, PE, C.G.C., Osmany Alfonso, P.E., Adrian Alfonso,E.I., <br />Eduardo Martinez, P.E., Alex Guon, P.E.
The URL can be used to link to this page
Your browser does not support the video tag.