Laserfiche WebLink
Similar Project Experience <br />This Design Build Project included the Installation of Water Main and <br />Storm Sewer System along Crespi Blvd between 85TH street and 79TH <br />Street. The project also includes the installations of over 2500 LF of Water <br />Main, over 2800 LF of Storm Sewer collection system, Installations of <br />pollution Control Structure, Installation of (1) Storm Sewer Pump Station, <br />construction of seawall and landscaping along a residential neighborhood. <br />This Design-Build Neighborhood Improvement Project included the <br />installation of over 4000 LF of drainage collection ranging from 18” <br />to 36” diameter and (1) Storm Water pump station in this residential <br />neighborhood. <br />CLIENT NAME City of Miami Beach <br />LEAD DESIGNER A&P Consulting Transportation Engineers, Corp. <br />PROJECT DURATION December 2014 / October 2015 <br />CONSULTANT CONTRACT AMOUNT 345,000.00 <br />CLIENT NAME City of Miami Beach <br />LEAD DESIGNER A&P Consulting Transportation Engineers, Corp. <br />PROJECT DURATION February 2005 / August 2006 <br />CONSTRUCTION VALUE $12,500,000 <br />LUIS SOTO, P.E. <br />(305) 673-7000 EXT: 6924 <br />luissoto@miamibeachfl.gov <br />LUIS SOTO, P.E. <br />(305) 673-7000 EXT: 6924 <br />luissoto@miamibeachfl.gov <br /> <br />Crespi Blvd Pump Station, City of Miami Beach, Florida <br />Praire Avenue Pump Station, City of Miami Beach, Florida <br />CO <br />N <br />T <br />A <br />C <br />T <br />CO <br />N <br />T <br />A <br />C <br />T <br />KEY PERSONNEL <br />KEY PERSONNEL <br />Arnelio Alfonso, P.E., Lazaro Ferrero, P.E., Angela Baron-Ruiz, P.E., Antonio G. Acosta, PE, C.G.C., Osmany Alfonso, P.E., Adrian Alfonso,E.I., <br />Eduardo Martinez, P.E., Alex Guon, P.E. <br />Arnelio Alfonso, P.E., Lazaro Ferrero, P.E., Angela Baron-Ruiz, P.E., Antonio G. Acosta, PE, C.G.C., Osmany Alfonso, P.E., Adrian Alfonso,E.I., <br />Eduardo Martinez, P.E., Alex Guon, P.E.