Similar Project Experience
<br />This Design Build Project included the Installation of Water Main and
<br />Storm Sewer System along Crespi Blvd between 85TH street and 79TH
<br />Street. The project also includes the installations of over 2500 LF of Water
<br />Main, over 2800 LF of Storm Sewer collection system, Installations of
<br />pollution Control Structure, Installation of (1) Storm Sewer Pump Station,
<br />construction of seawall and landscaping along a residential neighborhood.
<br />This Design-Build Neighborhood Improvement Project included the
<br />installation of over 4000 LF of drainage collection ranging from 18”
<br />to 36” diameter and (1) Storm Water pump station in this residential
<br />neighborhood.
<br />CLIENT NAME City of Miami Beach
<br />LEAD DESIGNER A&P Consulting Transportation Engineers, Corp.
<br />PROJECT DURATION December 2014 / October 2015
<br />CONSULTANT CONTRACT AMOUNT 345,000.00
<br />CLIENT NAME City of Miami Beach
<br />LEAD DESIGNER A&P Consulting Transportation Engineers, Corp.
<br />PROJECT DURATION February 2005 / August 2006
<br />CONSTRUCTION VALUE $12,500,000
<br />LUIS SOTO, P.E.
<br />(305) 673-7000 EXT: 6924
<br />luissoto@miamibeachfl.gov
<br />LUIS SOTO, P.E.
<br />(305) 673-7000 EXT: 6924
<br />luissoto@miamibeachfl.gov
<br />
<br />Crespi Blvd Pump Station, City of Miami Beach, Florida
<br />Praire Avenue Pump Station, City of Miami Beach, Florida
<br />CO
<br />N
<br />T
<br />A
<br />C
<br />T
<br />CO
<br />N
<br />T
<br />A
<br />C
<br />T
<br />KEY PERSONNEL
<br />KEY PERSONNEL
<br />Arnelio Alfonso, P.E., Lazaro Ferrero, P.E., Angela Baron-Ruiz, P.E., Antonio G. Acosta, PE, C.G.C., Osmany Alfonso, P.E., Adrian Alfonso,E.I.,
<br />Eduardo Martinez, P.E., Alex Guon, P.E.
<br />Arnelio Alfonso, P.E., Lazaro Ferrero, P.E., Angela Baron-Ruiz, P.E., Antonio G. Acosta, PE, C.G.C., Osmany Alfonso, P.E., Adrian Alfonso,E.I.,
<br />Eduardo Martinez, P.E., Alex Guon, P.E.
|