|
PROJECT MANAGER
<br />Arnelio Alfonso, P.E. (A&P)
<br />CITY OF SUNNY ISLES BEACH
<br />QA/QC
<br />Carlos M. Gil-Mera, P.E., C.G.C. (A&P)
<br />PRINCIPAL-IN-CHARGE
<br />Antonio G. Acosta, P.E., C.G.C. (A&P)
<br />PUMP STATION DESIGN GROUP
<br />Arnelio Alfonso, P.E. (A&P)Julian Gomez, E.I. (A&P)Roberto Lazamares, P.E. (A&P)Tania Fernandez (A&P)
<br />DRAINAGE DESING GROUP
<br />Lazaro Ferrero, P.E. (A&P)Angela M. Baron-Ruiz, P.E. (A&P)Magali Alfonso (A&P)Vivian Martinez (A&P)
<br />STRUCTURAL GROUP
<br />Osmany Alfonso, P.E. (A&P)Adrian Alfonso, E.I. (A&P)Nairobis Perez Villalobos (A&P)Jose Rodriguez (A&P)
<br />MECHANICAL/ELECTRICAL
<br />Eduardo Martinez, P.E. (A&P)Alex Guon, P.E. (A&P)Leonardo Sempe (A&P)Ricardo Batista (A&P)
<br />S U P P O R T S E R V I C E S
<br />SURVEY
<br />Eduardo M. Suarez, P.S.M. (LON)John Adler, P.S.M. (LON)Azahel Echevarria Gonzalez (LON)Daniel Ferrera (LON)
<br />GEOTECHNICAL
<br />Godwin Nnadi, Ph.D., P.E (NES)Brandon Johnson, E.I. (NES)Mustafa Syed, E.I. (NES)
<br />ENVIRONMENTAL PERMIT
<br />Angela M. Baron-Ruiz, P.E (A&P)Ariel Marquez, E.I. (A&P)
<br />NAME PUMPSTATION DRAI-NAGEDESIGN
<br />ENVIRON-MENTALPERMITS
<br />YEARSOFEXPER.Arnelio Alfonso, P.E. (A&P)x 33Antonio G. Acosta, P.E., C.G.C. (A&P)x x 32Carlos M. Gil-Mera, P.E., C.G.C. (A&P)x x 32Julian Gomez, E.I. (A&P)x x x 1Roberto Lazamares, P.E. (A&P) x x 9Tania Fernandez (A&P)x x x 17Lazaro Ferrero, P.E. (A&P)x 33Angela M. Baron-Ruiz, P.E. (A&P)x x 10Magali Alfonso (A&P)x 31Vivian Martinez (A&P)x x 32Osmany Alfonso, P.E. (A&P)x x 23Adrian Alfonso, E.I. (A&P)x x 4Nairobis Perez Villalobos (A&P)x x 5Jose Rodriguez (A&P)x 42Eduardo Martinez, P.E. (A&P)x 39Alex Guon, P.E. (A&P)x 28Leonardo Sempe (A&P)x 39Ricardo Batista (A&P)x 3Nelson Perez, P.E, C.G.C (A&P)x x 42Erik Sibila, P.E., C.G.C. (A&P)x x 10Alexander Milz, P.E. (A&P)x x 6Phillip Garcia, P.E. (A&P)x x 7Eduardo M. Suarez, P.S.M. (LON)x 33John Adler, P.S.M. (LON)x 34Azahel Echevarria Gonzalez (LON)x 15Daniel Ferrera (LON)x 15Godwin Nnadi, Ph.D., P.E (NES)x x 38Brandon Johnson, E.I. (NES)x x 4Mustafa Syed, E.I. (NES)x 10Ariel Marquez, E.I. (A&P)x x 0
<br />CONSTRUCTION MANAGEMENT
<br />Nelson Perez, P.E, C.G.C (A&P) Erik Sibila, P.E., C.G.C. (A&P)Alexander Milz, P.E. (A&P)Phillip Garcia, P.E. (A&P)Jorge Abela (A&P)
<br />CITY OF SUNNY ISLES BEACH | REQUEST FOR QUALIFICATIONS NO. 18-11-01
<br />CONSULTING ENGINEERING SERVICES FOR GOLDEN SHORES PUMP STATION REHABILITATION (CCNA)
<br />EXPERIENCEABREV.COMPANY(A&P)A&P Consulting Transportation Engineers, Corp.(LON)Longitude Surveyors, LLC(NES)Nadic Engineering Services, Inc.(MRG)Media Relations Group, LLC
<br />Organizational Chart
<br />A&P Consulting Transportation Engineers, Corp.
|