Laserfiche WebLink
<br /> STANDARD FORM 330 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Antonio G. Acosta, P.E., C.G.C. 13. ROLE IN THIS CONTRACT Principal-in-Charge 14. YEARS EXPERIENCE <br />a. TOTAL 31 b. WITH CURRENT FIRM 17 <br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• Bachelors of Science – Civil Engineering <br />Florida International University, Miami, Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• Florida Professional Engineer No. 40845 <br />• Fl. Certified General Contractor No. C.G.C.47411 <br />• Florida Certified Air Conditioning Contractor No. <br />CAC057593 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC), Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Roadways and Infrastructure Task Manager for the MIC Management Group. In charge of the development of Drainage and Utility Master Plan <br />for the 1.3 billion dollar projects. Also in charge of coordinating all the development of all the Roadway Plans, including Geotechnical, Survey, <br />Right of Way. Responsible for coordination with all different agencies having projects in the area like MDX, Miami Dade County Public Works, <br />City of Miami, Miami International Airport etc. <br />b. <br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from US-1 to SW 8th Street <br />Coral Gables, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepare a Contract Plans Set for the milling & resurfacing of a 2.5 mi segment of this urban corridor. Including upgrading ten signalized <br />intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA requirements, signing & pavement <br />markings, decorative lighting, and the design of a new 12" water main as part of a JPA between FDOT and M-D WASD, which included the <br />installation of approximately 3,150 L.F. of 12" D.I.P, 210 L.F. of 16” D.I.P., 1430 L.F. of 8” D.I.P. with fire hydrants, connections, and stub-outs. <br />c. <br />(1) TITLE AND LOCATION (City and State) SR-997 / Krome Avenue US-1 to Avocado Drive / SW 296th Street, <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This portion of Krome Avenue is a north-south two-lane roadway that extends approximately 3.78 miles from US-1 to Avocado Drive, running <br />through the center of Florida City and the City of Homestead in southern Miami-Dade County. Mr. Acosta prepared Construction Documents <br />(plans and specifications) for the 3.78 mile segment of this urban corridor, including signing & pavement markings, upgrading seven signalized <br />intersections from span-wire to mast-arm, a new signalized intersection, 0.5 mi of lighting, implementation of four traffic safety studies, <br />implementation of Access Management and compliance with ADA requirements, Landscaping, & Irrigation within the City of Homestead, Fl. <br />d. <br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from SW 8th Street to NW <br />11th Street, Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepare a Contract Plans Set for the milling & resurfacing of a 1.2 mi segment of this urban corridor. Including upgrading two signalized <br />intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA requirements, signing & pavement <br />markings, and the design of a new 12" water main as part of a JPA between FDOT and M-D WASD, which included the installation of <br />approximately 4,306 L.F. of 12" D.I.P., 60 L.F. of 8" D.I.P., and 440 L.F. of 6" D.I.P. with fire hydrants, connections, & stub-outs. <br />e. <br />(1) TITLE AND LOCATION (City and State) S.W. 62nd Avenue from SW 24th Street to NW 7th Street, Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor. Including upgrading one signalized <br />intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA requirements, drainage design, <br />signing & pavement markings, and the design of a new street lighting system.