Laserfiche WebLink
<br /> STANDARD FORM 330 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Arnelio Alfonso, P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE <br />a. TOTAL 32 b. WITH CURRENT FIRM 17 <br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• Bachelor of Science in Civil Engineering, IPSJAE <br />Havana, Cuba, 1985 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• Florida Professional Engineer No. 52566 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />• Hydrology Course 1988 University of Madrid,Spain <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Nautilus Neighborhood Streetscape Improvements Design-Built <br />Project, Miami Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record and Project Manager for this design/build project. Responsibilities included the design of water main distribution mains, <br />storm water injection wells system with pump stations, streetscape improvements, road milling and resurfacing, street lighting design, signing <br />and markings and signalization design. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Washington Avenue Design-Built Project – Phase 2, 4 and 5, Miami <br />Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record and Project Manager for this design/build project. Responsibilities included the design of water main distribution mains, <br />sanitary sewer pipe/manhole up sizing, storm water gravity wells system, new curb/gutter and sidewalk, road milling and resurfacing, street <br />lighting design, signing and markings and signalization design. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) NW 14th Street Reconstruction, Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2002 CONSTRUCTION (If applicable) 2004 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record and Project Manager for the total reconstruction of NW 14th Street from NW 42nd Court to NW 34th Avenue. This project <br />included the preparation of Roadway Plans, Drainage improvements including a Pump Station, Signalization, Lighting, Signing & Pavement <br />Markings, and Intelligent Transportation System (I.T.S) Plans. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) SR-804 / Boynton Beach Blvd., 3R Project and Minor Bridge Widening, <br />Palm Beach County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineer of Record for the Milling & Resurfacing of Boynton Beach Blvd. from Old Boynton Beach to US-1. This project included the preparation <br />of Roadway Plans for Milling & Resurfacing, Minor Bridge Plans, Signalization and Signing Marking Plans <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC), Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Responsible for the development of the Utility Master Plan for the MIC Program as well as the preparation of Utility Relocation Schedules, <br />Reimbursable Agreements with utility companies, Utility Clear Packages and Utility Design by FDOT Consultant Agreements (JPA’s) for all the <br />MIC Roadway Projects. <br />