|
<br /> STANDARD FORM 330
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Arnelio Alfonso, P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE
<br />a. TOTAL 32 b. WITH CURRENT FIRM 17
<br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• Bachelor of Science in Civil Engineering, IPSJAE
<br />Havana, Cuba, 1985
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />• Florida Professional Engineer No. 52566
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />• Hydrology Course 1988 University of Madrid,Spain
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Nautilus Neighborhood Streetscape Improvements Design-Built
<br />Project, Miami Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record and Project Manager for this design/build project. Responsibilities included the design of water main distribution mains,
<br />storm water injection wells system with pump stations, streetscape improvements, road milling and resurfacing, street lighting design, signing
<br />and markings and signalization design.
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Washington Avenue Design-Built Project – Phase 2, 4 and 5, Miami
<br />Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2006
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record and Project Manager for this design/build project. Responsibilities included the design of water main distribution mains,
<br />sanitary sewer pipe/manhole up sizing, storm water gravity wells system, new curb/gutter and sidewalk, road milling and resurfacing, street
<br />lighting design, signing and markings and signalization design.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) NW 14th Street Reconstruction, Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2002 CONSTRUCTION (If applicable) 2004
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record and Project Manager for the total reconstruction of NW 14th Street from NW 42nd Court to NW 34th Avenue. This project
<br />included the preparation of Roadway Plans, Drainage improvements including a Pump Station, Signalization, Lighting, Signing & Pavement
<br />Markings, and Intelligent Transportation System (I.T.S) Plans.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) SR-804 / Boynton Beach Blvd., 3R Project and Minor Bridge Widening,
<br />Palm Beach County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record for the Milling & Resurfacing of Boynton Beach Blvd. from Old Boynton Beach to US-1. This project included the preparation
<br />of Roadway Plans for Milling & Resurfacing, Minor Bridge Plans, Signalization and Signing Marking Plans
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC), Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 2006
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for the development of the Utility Master Plan for the MIC Program as well as the preparation of Utility Relocation Schedules,
<br />Reimbursable Agreements with utility companies, Utility Clear Packages and Utility Design by FDOT Consultant Agreements (JPA’s) for all the
<br />MIC Roadway Projects.
<br />
|