Laserfiche WebLink
<br /> STANDARD FORM 330 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Lazaro. Ferrero, P.E. 13. ROLE IN THIS CONTRACT Stormwater / Permitting 14. YEARS EXPERIENCE <br />a. TOTAL 32 b. WITH CURRENT FIRM 14 <br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• Bachelor of Science - Civil Engineering, 1985. <br />Polytechnic University of Havana Cuba <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• Florida Professional Engineer No. 58025 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Districtwide Traffic Safety Studies, FDOT District 4, Broward County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager and Sr. Traffic Engineer on this contract which includes a wide range of traffic safety studies such as pedestrian safety <br />studies, fatal crash reviews and Road Safety Audits (RSAs). This contract includes 16 hours per week of in-house support services at the <br />Engineer Intern level at the District Four offices. <br />b. <br />(1) TITLE AND LOCATION (City and State) Districtwide Pedestrian and Bicycle Safety Studies, FDOT, District Six, <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager and Sr. Traffic Engineer on this contract. The focus of this contract is the investigation of citizen’s requests related to <br />pedestrian and bicycle safety and mobility. This contract includes a full time Engineer Intern at the District Six offices performing studies and <br />field investigation and also developing work orders for maintenance to implement signing and pavement marking improvements such as the <br />implementation of high emphasis crosswalks and “Turning Vehicle Yield To Pedestrians” signs. <br />c. <br />(1) TITLE AND LOCATION (City and State) SR 90/SW 8th Street from SW 142nd Avenue to SW 67th Avenue, <br />FDOT, District Six <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The scope of this project includes the implementation of the first Adaptive Signal Control Technology project (ASCT) in Miami-Dade County at <br />29 signalized intersections along SR 90/SW 8th Street. Mr. Espino is responsible for the inventory and inspection of the existing signal cabinets, <br />controllers, conduits and pull boxes to determine the need for equipment upgrade as part of the project. He is also responsible for the travel <br />time data collection using Wifi devices as part of the before and after evaluation phase of the pilot project. Mr. Espino has performed <br />extensive coordination with the Miami-Dade County Traffic Control Center to ensure a smooth transition from existing signal operation to <br />operation under ASCT. <br />d. <br />(1) TITLE AND LOCATION (City and State) SR 5/US 1 from SW 19500 Block to I-95 Signal Re-timing and <br />Monitoring, FDOT, District Six <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This project is part of the Districtwide Signal Retiming Contract with the D6 Traffic Operations Office. The tasks included daily monitoring of <br />traffic conditions from using CCTV cameras at the D6 Sunguide Transportation Management Center. Monitoring was with the objective of the <br />monitoring was to identify operational deficiencies and areas of recurrent congestion and to develop and implement signal timing changes to <br />improve these conditions. The monitoring also included using Regional Integrated Transportation Information System (RITIS) data to monitor <br />operational performance before and after the implementation of the signal timing changes. <br />e. <br />(1) TITLE AND LOCATION (City and State) Districtwide Traffic Operations and Safety Studies Contract (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />A task work order driven contract which included the investigation of fatal crashes and high crash locations district-wide. As part of this <br />contract Mr. Espino completed over 850 fatal crash reviews to determine roadway contributory causes. Mr. Espino also performed safety <br />studies districtwide and developed safety improvement projects at over fifty intersections and segments. <br /> <br /> <br /> <br />