|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Eduardo Martinez, P.E. 13. ROLE IN THIS CONTRACT Senior Electrical, Lighting And Its
<br />Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL 39 b. WITH CURRENT FIRM 13
<br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• Bachelor of Science Civil Engineering, 1979 Polytechnic
<br />University of Havana, Havana, Cuba
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />• Florida Professional Engineer No. 52023
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Districtwide Traffic Operations Push Button Contract, Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The purpose of this Contract is to implement and design improvements related to safety and operational, usually requested by public and
<br />elected officials. These assignments are typically of quick turn-around (2 weeks to design) and fast response (2 weeks to construct) nature.
<br />The following is partial list of pedestrian and bicycle studies completed in City of Coral Gables and other local municipalities as part of this
<br />contract.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) Districtwide Miscellaneous PE Design Consultant, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This Contract includes a variety of design assignments, including RRR Project, Safety and Operational projects. The following is partial list of
<br />design projects completed within the City of Coral Gables and other municipalities as part of this contract: SR-5 / US-1 / South Dixie Highway
<br />at Grand Avenue; SR-5 / US-1 / South Dixie Highway from Santona Street to East of Granada Blvd; SR-5 / US-1 / South Dixie Highway from SR-
<br />94 / Kendall Drive to SW 80th Street / Davis Road.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) Miscellaneous Design Consultant, Miami, Florida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The purpose of this Contract is to provide design services to the CIPT to address residents complaint related to safety, operational, and
<br />drainage issues. The following is a list of the relevant projects: Flagami Traffic Calming Improvements; Coral Gate Community Improvements;
<br />Miami River Greenway SW 1st Court to South Miami Avenue
<br />d.
<br />(1) TITLE AND LOCATION (City and State) Miami Performing Arts Center Streetscape Improvements, City of
<br />Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2006
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Designer of record to Prepare Construction Documents (plans and specifications) for the reconstruction of SR-5 / Biscayne Boulevard for NE
<br />13th Street, NE 14th Street, NE 15th Street, NE 2nd Avenue and N. Bayshore Drive. Project included preparation of contract documents including
<br />milling and resurfacing, upgrading existing sidewalks to artistic pavers, new decorative lighting, signing and pavement markings and landscape.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Neighborhood 10-B Flamingo Streetscape Improvements, City of
<br />Miami Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Manager responsible for the Design-Build Project of 7th, 8th Street (from Meridian Avenue to Pennsylvania Avenue), Meridian
<br />Ave, Euclid Ave, and Pennsylvania Ave (from 7th to 9th Street). Project includes reconstruction of roadway, sidewalk, ADA compliance, safety
<br />improvements, signing, pavement markings, new drainage, water main upgrades, and lighting. Responsible for obtaining all local permits and
<br />utility coordination.
<br />
<br />
<br />
<br />
<br />
|