Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Eduardo Martinez, P.E. 13. ROLE IN THIS CONTRACT Senior Electrical, Lighting And Its <br />Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL 39 b. WITH CURRENT FIRM 13 <br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• Bachelor of Science Civil Engineering, 1979 Polytechnic <br />University of Havana, Havana, Cuba <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• Florida Professional Engineer No. 52023 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Districtwide Traffic Operations Push Button Contract, Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The purpose of this Contract is to implement and design improvements related to safety and operational, usually requested by public and <br />elected officials. These assignments are typically of quick turn-around (2 weeks to design) and fast response (2 weeks to construct) nature. <br />The following is partial list of pedestrian and bicycle studies completed in City of Coral Gables and other local municipalities as part of this <br />contract. <br />b. <br />(1) TITLE AND LOCATION (City and State) Districtwide Miscellaneous PE Design Consultant, Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This Contract includes a variety of design assignments, including RRR Project, Safety and Operational projects. The following is partial list of <br />design projects completed within the City of Coral Gables and other municipalities as part of this contract: SR-5 / US-1 / South Dixie Highway <br />at Grand Avenue; SR-5 / US-1 / South Dixie Highway from Santona Street to East of Granada Blvd; SR-5 / US-1 / South Dixie Highway from SR- <br />94 / Kendall Drive to SW 80th Street / Davis Road. <br />c. <br />(1) TITLE AND LOCATION (City and State) Miscellaneous Design Consultant, Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The purpose of this Contract is to provide design services to the CIPT to address residents complaint related to safety, operational, and <br />drainage issues. The following is a list of the relevant projects: Flagami Traffic Calming Improvements; Coral Gate Community Improvements; <br />Miami River Greenway SW 1st Court to South Miami Avenue <br />d. <br />(1) TITLE AND LOCATION (City and State) Miami Performing Arts Center Streetscape Improvements, City of <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designer of record to Prepare Construction Documents (plans and specifications) for the reconstruction of SR-5 / Biscayne Boulevard for NE <br />13th Street, NE 14th Street, NE 15th Street, NE 2nd Avenue and N. Bayshore Drive. Project included preparation of contract documents including <br />milling and resurfacing, upgrading existing sidewalks to artistic pavers, new decorative lighting, signing and pavement markings and landscape. <br />e. <br />(1) TITLE AND LOCATION (City and State) Neighborhood 10-B Flamingo Streetscape Improvements, City of <br />Miami Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Manager responsible for the Design-Build Project of 7th, 8th Street (from Meridian Avenue to Pennsylvania Avenue), Meridian <br />Ave, Euclid Ave, and Pennsylvania Ave (from 7th to 9th Street). Project includes reconstruction of roadway, sidewalk, ADA compliance, safety <br />improvements, signing, pavement markings, new drainage, water main upgrades, and lighting. Responsible for obtaining all local permits and <br />utility coordination. <br /> <br /> <br /> <br /> <br />