|
<br /> STANDARD FORM 330
<br />
<br />
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Erik Sibila, P.E., M.S.C.E., C.G.C. 13. ROLE IN THIS CONTRACT Senior Pm / Project Administrator 14. YEARS EXPERIENCE
<br />a. TOTAL 14 b. WITH CURRENT FIRM 11
<br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• Master of Science Civil Engineering, 2011 FL,
<br />International University Miami, FL
<br />• Bachelor of Science Civil Engineering, 2008
<br />Architectural Engineering, 2008, Summa Cum Laude
<br />University of Miami, Coral Gables, Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />• 2012, FL P.E. No.74663
<br />• 2004, FL General Contractor CGC1508340
<br />• 2013, FL Surveyor-in-Training
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC); Water and Sewer Improvements &
<br />Drainage Master Plan, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES February 2003 CONSTRUCTION (If applicable) December 2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Water Resources Project Manager, was responsible for preparing the Water and Sewer Improvement Program. This project included
<br />coordination with MD-WASD and all utility companies present in the area in order to design a master water and sewer system which included
<br />the design of a new regional lift station (PS 101), a gravity sewer system, 12" force main and 24" water main that will provide services to the
<br />future Rental Car Center and a 30" steel casing installed by microtunneling under the CSX RR. As well as the Development a Stormwater
<br />Management Master Plan for a total area of 742 Acres.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from US-1 to SW 8th Street
<br />Coral Gables, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES March 2005 CONSTRUCTION (If applicable) October 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Water Resources Project Manager, Mr. Alfonso was responsible for design of a 12" Water Main Plans as part of a JPA between FDOT and
<br />M-D WASD, which included the installation of approximately 3,150 L.F. of 12" D.I.P, 210 L.F. of 16” D.I.P., 1430 L.F. of 8” D.I.P. with fire
<br />hydrants, connections, and stub-outs. Project also included the upgrade of the drainage system.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) NW 37 Avenue/Transit Access Road; 24" Force Main, Miami, FLorida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES December 2004 CONSTRUCTION (If applicable) September 2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Project Manager, Mr. Alfonso was responsible for design of a 24" Force main along the Transit Access Road from NW 25 ST to NW 28 ST.
<br />The project included 2000 LF of a 24" force main that serves the City of Miami Springs; the existing meter P-10 was relocated as part of this
<br />project, as well as the design of the French Drain System.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) NE 103 ST / SR 932; 16" Water Main, Miami, FL.
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES May 2004 CONSTRUCTION (If applicable) June 2006
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Project Manager, Mr. Alfonso was responsible for design of a 16" Water Main along NE 103 ST from NW 7 Avenue to NE 6 Avenue. The
<br />project included 8000 LF of a 16" water main, the installation of 143 water service lines with the corresponding water meters and 18 new fire
<br />hydrants
<br />e.
<br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from SW 8th Street to NW
<br />11th Street, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES July 2005 CONSTRUCTION (If applicable) January 2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Water Resources Project Manager, Mr. Alfonso was responsible for design of a 12" Water Main Plans as part of a JPA between FDOT and
<br />M-D WASD, which included the installation of approximately 4,306 L.F. of 12" D.I.P., 60 L.F. of 8" D.I.P., and 440 L.F. of 6" D.I.P. with fire
<br />hydrants, connections, and stub-outs. Project also included the upgrade of the drainage system.
|