Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Erik Sibila, P.E., M.S.C.E., C.G.C. 13. ROLE IN THIS CONTRACT Senior Pm / Project Administrator 14. YEARS EXPERIENCE <br />a. TOTAL 14 b. WITH CURRENT FIRM 11 <br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• Master of Science Civil Engineering, 2011 FL, <br />International University Miami, FL <br />• Bachelor of Science Civil Engineering, 2008 <br />Architectural Engineering, 2008, Summa Cum Laude <br />University of Miami, Coral Gables, Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• 2012, FL P.E. No.74663 <br />• 2004, FL General Contractor CGC1508340 <br />• 2013, FL Surveyor-in-Training <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC); Water and Sewer Improvements & <br />Drainage Master Plan, Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES February 2003 CONSTRUCTION (If applicable) December 2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Water Resources Project Manager, was responsible for preparing the Water and Sewer Improvement Program. This project included <br />coordination with MD-WASD and all utility companies present in the area in order to design a master water and sewer system which included <br />the design of a new regional lift station (PS 101), a gravity sewer system, 12" force main and 24" water main that will provide services to the <br />future Rental Car Center and a 30" steel casing installed by microtunneling under the CSX RR. As well as the Development a Stormwater <br />Management Master Plan for a total area of 742 Acres. <br />b. <br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from US-1 to SW 8th Street <br />Coral Gables, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES March 2005 CONSTRUCTION (If applicable) October 2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Water Resources Project Manager, Mr. Alfonso was responsible for design of a 12" Water Main Plans as part of a JPA between FDOT and <br />M-D WASD, which included the installation of approximately 3,150 L.F. of 12" D.I.P, 210 L.F. of 16” D.I.P., 1430 L.F. of 8” D.I.P. with fire <br />hydrants, connections, and stub-outs. Project also included the upgrade of the drainage system. <br />c. <br />(1) TITLE AND LOCATION (City and State) NW 37 Avenue/Transit Access Road; 24" Force Main, Miami, FLorida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES December 2004 CONSTRUCTION (If applicable) September 2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Project Manager, Mr. Alfonso was responsible for design of a 24" Force main along the Transit Access Road from NW 25 ST to NW 28 ST. <br />The project included 2000 LF of a 24" force main that serves the City of Miami Springs; the existing meter P-10 was relocated as part of this <br />project, as well as the design of the French Drain System. <br />d. <br />(1) TITLE AND LOCATION (City and State) NE 103 ST / SR 932; 16" Water Main, Miami, FL. <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES May 2004 CONSTRUCTION (If applicable) June 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Project Manager, Mr. Alfonso was responsible for design of a 16" Water Main along NE 103 ST from NW 7 Avenue to NE 6 Avenue. The <br />project included 8000 LF of a 16" water main, the installation of 143 water service lines with the corresponding water meters and 18 new fire <br />hydrants <br />e. <br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from SW 8th Street to NW <br />11th Street, Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES July 2005 CONSTRUCTION (If applicable) January 2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />As Water Resources Project Manager, Mr. Alfonso was responsible for design of a 12" Water Main Plans as part of a JPA between FDOT and <br />M-D WASD, which included the installation of approximately 4,306 L.F. of 12" D.I.P., 60 L.F. of 8" D.I.P., and 440 L.F. of 6" D.I.P. with fire <br />hydrants, connections, and stub-outs. Project also included the upgrade of the drainage system.