|
<br /> STANDARD FORM 330
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Phillip Garcia, E.I. 13. ROLE IN THIS CONTRACT Senior Inspector 14. YEARS EXPERIENCE
<br />a. TOTAL 5 b. WITH CURRENT FIRM 5
<br />15. FIRM NAME AND LOCATION (City and State) A&P Consulting Transportation Engineers, Corp., Doral, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />• University of Florida - Gainesville, Florida, Awarded
<br />Bachelor of Science in Civil Engineering, December
<br />2011.
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />• Florida Engineer Intern No.1100018392
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) NW 25 ST, 36" Force Main, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES May 2005 CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As the Project Engineer, Mr. Ferrero assisted in the design of a 36" Force main along NW 25th Street from NW 89 Avenue to SR-826 (Palmetto
<br />Expressway). The project included a crossing of a DERM Canal through a 54" steel casing
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) SR 953 / NW 42 Ave, 12" Water Main, Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES March 2005 CONSTRUCTION (If applicable) May 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Project Engineer, Mr. Ferrero assisted in the design of a 12" Water Main Plans as part of a JPA between FDOT and M-D WASD, which
<br />included the installation of approximately 3,150 L.F. of 12" D.I.P, 210 L.F. of 16” D.I.P., 1430 L.F. of 8” D.I.P. with 12 fire hydrants, 500 LF of
<br />service lines, and stub-outs. Project also included the upgrade of the drainage system
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Rental Car Center (RCC), Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES November 2008 CONSTRUCTION (If applicable) July 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer for the site civil plans, which included paving, grading and drainage, domestic and fire water mains and the sanitary system
<br />design, following the MDWASD and FDOT drainage manual requirements. The total area of the project is 30 Acres
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) Miami Intermodal Center (MIC), FDOT District 6, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES February 2003 CONSTRUCTION (If applicable) December 2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Development a Stormwater Management Master Plan. This is multimodal transportation facility, which link Metrorail, Amtrak, Tri-Rail, High
<br />Speed Train and Metrobus. The total area of the project is 742 Acres, which includes the SR 836/SR 112 Interconnector, MIC Core, Rental Car
<br />Facilities, MIC/MIA Connector and Baggage Tunnel.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) SR-953 / S.W. 42nd Avenue / Le Jeune Road, from SW 8th Street to NW
<br />11th Street, Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES July 2005 CONSTRUCTION (If applicable) January 2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />As Project Engineer, Mr. Ferrero assisted in the design of a 12" Water Main Plans as part of a JPA between FDOT and M-D WASD, which
<br />included the installation of approximately 4,306 L.F. of 12" D.I.P., 60 L.F. of 8" D.I.P., and 440 L.F. of 6" D.I.P. with fire hydrants, connections,
<br />and stub-outs. Project also included the upgrade of the drainage system.
|