Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Mustafa Syed 13. ROLE IN THIS CONTRACT - 14. YEARS EXPERIENCE <br />a. TOTAL 11 b. WITH CURRENT FIRM - <br />15. FIRM NAME AND LOCATION (City and State) Nadic Engineering Services, inc. <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• B.S Civil Engineering, 2006, Osmania University, India <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ACI Concrete Field Testing- Grade 1 <br />FDOT Concrete Field Technician Level 1 <br />FDOT Earthwork Construction Inspector–Level 1 <br />FDOT Asphalt Paving Level 1 & 2 <br />FDOT Asphalt Plant Level 1 <br />Nuclear Gauge Safety & U.S.D.O.T Hazmat <br />Intermediate MOT <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) PSIP Design Services For Pump Stations, Miami-Dade County (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES - CONSTRUCTION (If applicable) - <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Miami-Dade Water and Sewer Department (MDWASD) MDWASD has established a Pump Station Improvement Program (PSIP) <br />for upgrading the Wastewater Collection and Transmission System (WCTS) that includes pump stations and force mains pursuant <br />to which each pump station has to be certified as capable of meeting a Nominal Average Pump Operating Time (NAPOT) of less <br />than or equal to 10 hours per day. Mr. Syed conducted the required geotechnical evaluations and recommendations. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) 30-Inch D.I.P Force Main In Sw 3 Avenue From Sw 15 Road To Sw 11 <br />Street <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES - CONSTRUCTION (If applicable) - <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />NADIC was retained by MDWASD to conduct geotechnical engineering investigation for installation of 30-inch Ductile Iron Pipe <br />(D.I.P.) Force Main Installation along SW 3rd Avenue in Miami. Mr. Syed assisted as the project engineer on geotechnical <br />engineering investigation. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />