Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME x 13. ROLE IN THIS CONTRACT x 14. YEARS EXPERIENCE <br />a. TOTAL x b. WITH CURRENT FIRM x <br />15. FIRM NAME AND LOCATION (City and State) Longitude Surveyors LLC, Doral, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• x <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• x <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Ponce de Leon Median Installation and Roadway Improvements <br />(Phase II), Ponce de Leon Blvd from Alcazar Ave to Sidonia Ave., City <br />of Coral Gables, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Performed surveying and mapping services; Curb and Gutter Median Stakeout, West Side Curb and Gutter Stakeout, East Side <br />Curb and Gutter Stakeout, Mast Arm Stakeout for the Salamanca Intx, and Final As-Built Survey. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) City of Miramar Improvements, Miramar, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Perform and Prepare a Topographic Survey along various streets in the City of Miramar over 75,000 +/- linear feet was surveyed. <br />Project Manager <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) E07-WASD-07A Design of Distribution of Pipeline for Reclaimed Water <br />System from Central District Wastewater Treatment Plant to Key <br />Biscayne (5 miles) including the Bear Cut Channel Survey, Miami. <br />Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Survey-Topographic Survey, Showed all improvements from Right-of-Way to Right-of-Way, Establishing Horizontal and Vertical <br />Control for future construction, Cross Sections (spot elevations), All utility information provided, Tree Descriptions. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) City of Miami Glenroyal Corridor Drainage Improvements, City of <br />Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Topographic Survey, established Vertical and Horizontal control for future construction, all utility information provided, cross <br />sections (spot elevations, tree information, all improvements shown from Right-of-Way to Right-of-Way. <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) FDOT District VI, Collins Ave. (State Road A-1-A) from Lincoln Road to <br />26 Street, City of Miami Beach, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />1.25 miles of Topographic Survey / Show all improvements from Right-of-Way to Right-of-Way / Establishing Horizontal and <br />Vertical Control for future construction / Cross sections (spot elevations). <br />