My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br />GOLDEN SHORES PUMP STATION REHABILITATION (CCNA) <br />RFQ 18-11-01 <br />4 <br />of several Pump Stations in Miami Dade County, the design and construction of the Miami Beach Convention Center Pump Station and the City of Miami Beach Crespi Blvd Pump Station illustrate APCTE’s Team proficiency to surpass expectations for these types of projects. These projects, just to name a few, are a testimony of our Team’s unmatched qualifications and dedication to deliver excellence. <br />EXPERIENCE IN SIMILAR PROJECTS <br />Project Client Design Cost Completed by <br />Rehabilitation of PS 351 MD WASD $187,000 2016 <br />Stormwater Pump Station – C. Center City of Miami Beach $450,000 2018 <br />Stormwater pump Station – Crespi Blvd City of Miami Beach $345,000 2015 <br />Rehabilitation of PS 437 MD WASD $195,000 2016 <br />Availability:APCTE has more than 85 local employees (26 Registered PE’s and 61 Graduate Engineers) dedicated exclusively to drainage, transportation and pipeline design projects. APCTE’s workforce and availability is high at this time since we are just finishing a big project which will be done prior to us obtaining the NTP for this project. We currently have 12 dedicated personnel in our Water Resources Department, 13 dedicated personnel in our Civil/Highway Department, 10 dedicated personnel in our Electrical, Lighting Department, 5 dedicated personnel in our Structural Department and 17 dedicated personnel in our Construction Engineering and Inspection Services Department. The amount of work currently available, and the manner in which APCTE effectively manages its time and resources, allows for every team member to be engaged with said projects and to assiduously dedicate themselves to new projects. <br />Why select the APCTE Team? <br />• Our experience as a team on the design of several stormwater pump stations. One of the pump stations completed by our firm was nominated by the CAACE as Project of the Year in 2013• Our in-depth knowledge of The City, DRER and SFWMD design requirements for Pump Stations.• Our knowledge of the scope of work of this contract, its challenges and its solutions.• Our ability to coordinate and expedite the permitting processes with the environmental and permitting agencies for stormwater pump station projects.• Our Team’s experience, awareness of key project issues, established working relationship with our sub-consultants.• Our commitment to provide the City of Sunny Isles Beach with construction documents that will, to the highest degree possible, avoid claims, supplemental agreements and construction delays. <br />We feel confident that we can successfully implement this project to meet the City’s expectations. It is our purpose to continue working in a partnership with your staff and deliver this project on schedule and within budget. <br />Sincerely, <br />Antonio G. Acosta, P.E., President APCTE
The URL can be used to link to this page
Your browser does not support the video tag.