My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />8 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Mt. Sinai Pump Station, Miami Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />- <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Pro Service Group, Llc <br />b. POINT OF CONTACT NAME <br />Julio Amoedo <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 989-8044 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />LS prepared and performed a Topographic Survey. Longitude established right-of-way lines, subdivision lines, section <br />lines, lot lines, base lines and easement lines as required by the project. LS established line data from the right-of-way <br />maps and MDWASD and utility easement records. Set points of curvature and points of tangency in the field. All <br />improvements were shown from Right of Way to Right of Way. Longitude established location of trees, rim, top and <br />invert elevations of all existing sanitary sewers’ manholes, pump wet and dry wells, sanitary sewer lines, drainage <br />culverts, manholes and catch basins and grate elevations, diameter of the wet/dry well and valve vault dimensions. <br />Location of project site perimeter, driveway and station service/staging area corners (including finished grade low and <br />high points) with elevations. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />Longitude Surveyors, LLC <br />(2) FIRM LOCATION (City and State) <br />Doral, Florida <br />(3) ROLE <br />Surveying and Mapping <br />b. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.