My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />9 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Pump Station 0860, Miami, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />MDWASD <br />b. POINT OF CONTACT NAME <br />Arnelio Alfonso <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 592-7283 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />LS performed Subsurface Utility Engineering to include the following information: designated twenty-four (24) areas <br />where there were conflicting lines using an Electromagnetic Locator and Ground Penetrating Radar (GPR). LS provided <br />elevations at surface and measure down will be made to the top of pipe. LS determined the size, type of material, & <br />provided thedimensions of the encasement and provided field work sheets for each pot hole. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />A&P Consulting Transportation Eng. <br />(2) FIRM LOCATION (City and State) <br />Doral, Florida <br />(3) ROLE <br />Prime / Civil Engineering <br />b. (1) FIRM NAME <br />Longitude Surveyors, LLC <br />(2) FIRM LOCATION (City and State) <br />Doral, Florida <br />(3) ROLE <br />Surveying and Mapping <br />c. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.