Laserfiche WebLink
<br /> STANDARD FORM 330 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />10 <br /> <br />21. TITLE AND LOCATION (City and State) <br />PSIP Design Services for Pump Stations <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />- <br />CONSTRUCTION (If applicable) <br />- <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />MDWASD <br />b. POINT OF CONTACT NAME <br />Arnelio Alfonso, P.E. <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 592-7283 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />MDWASD has established a Pump Station Improvement Program (PSIP) for upgrading the Wastewater Collection and <br />Transmission System (WCTS) that includes pump stations and force mains pursuant to which each pump station has to <br />be certified as capable of meeting a Nominal Average Pump Operating Time (NAPOT) of less than or equal to 10 hours <br />per day. NADIC is retained by APCTE to conduct the required geotechnical services. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME <br />A&P Consulting Transportation Eng. (2) FIRM LOCATION (City and State) <br />Doral, Florida <br />(3) ROLE <br />Prime / Civil Engineering <br />b. <br />(1) FIRM NAME <br />Nadic Engineering Services, Inc. <br />(Nadic) <br />(2) FIRM LOCATION (City and State) <br />601 N. Hart Blv Orlando, FL 32828 <br />(3) ROLE <br />Geotechnical <br />c. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> <br />