Laserfiche WebLink
39 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fA ticab/e) <br />Sanitary Sewer Improvements Phase I <br />Bal Harbour, Florida <br />2015 <br />2017 <br />C <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The Wastewater Pump Station No. 3 and Gravity Sewer Improvements (Sanitary Sewer <br />Improvements Phase 1) project for Bal Harbour Village includes the installation of a new <br />triplex submersible pump station with a 12 -foot diameter wet well, control panel, <br />automatic transfer switch receptacle, emergency generator, and all associated <br />appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines <br />to the pump station. Construction cost: $2,970,000 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fApp/icab/e) <br />City of Sunny Isles Beach NE 17411 Street <br />d <br />Stormwater and Pavement Improvements <br />Sunny Isles Beach, Florida <br />2011 <br />2017 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project consists of reconstruction of both drainage and roadway along NE 1741h <br />Street for approximately 0.2 miles from Collins Avenue to North Bay Road. The design <br />also includes a new drainage system that meets water quality requirements, site <br />demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping, <br />curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase 1) <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES I <br />CONSTRUCTION (/fApplicab/e) <br />Stormwater & Pump Station Improvements Phase <br />IV <br />2011 <br />2013 <br />e <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV <br />Stormwater Improvements for the City of Sweetwater received substantial HMGP <br />funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of <br />drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force <br />main and two (2) triplex stormwater pumping stations (28 HP). Construction cost: <br />$4.09 Million <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fApplicable) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />f <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project Consisted of a stormwater master pump station, 14,500 linear feet of DIP <br />drainage pipe and stormwater force main ranging in size from 16 -inch to 72 -inch. <br />Construction cost: $7,667,276 <br />39 <br />