Laserfiche WebLink
43 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION OfA ticable) <br />Stormwater System Improvements <br />Moore Haven, Florida <br />2011 2015 <br />d <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Planning, survey, utility locates, design, permitting, bidding assistance and <br />construction management and inspection services for the Ranch Lakes Estates <br />Improvements project for the City of Moore Haven which consisted of the construction <br />of a gravity stormwater drainage system along with two (2) master stormwater pump <br />stations including force mains and canal dredging. Construction included the <br />installation of 7,103 linear feet of HDPE drainage pipe ranging in diameter from 15 -inch <br />to 48 -inch, 1,044 LF of force main, 76 drainage structures and two duplex stormwater <br />pump stations. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION flfAppticable) <br />Avenue L, M, N, & 4th Gravity Sanitary, Force Main <br />Sewer & Lift Station Improvements <br />2015 <br />2016 <br />e <br />Moore Haven, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Construction of duplex submersible lift station with an 8 - <br />foot diameter wet well and approximately 350 linear feet of 6 -inch force main along <br />with 6,344 linear feet of associated 8 -inch and 10 -inch gravity sewer line. Services <br />included survey, design, permitting, preparation of construction plans and contract <br />documents, bidding and construction management. Project cost $1,286,627 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION(/fAppiicabte) <br />Miccosukee Tribe of Florida Water Distribution <br />System <br />2007 2013 <br />f <br />Miami, Florida <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, eta)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Survey, design, permitting, contract development, bidding <br />services, construction oversight for installation of 15,000 feet of 12" water main <br />including a 1 MG ground storage tank and pump system. Project cost $2.3 Million <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable) <br />Ranch Lakes Estates Gravity Sewer Installation <br />Moore Haven, Florida <br />2011 2012 <br />9 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Removal of existing home owner septic tanks and <br />replacement with a gravity sanitary sewer system and wastewater lift station. <br />Services included survey, design, permitting, preparation of construction plans and <br />contract documents, bidding and construction management. Project cost $483,823 <br />43 <br />