Laserfiche WebLink
1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Moore Haven Phase I Sewer System PROFESSIONAL SERVICES CONSTRUCTION (llApplicab/e <br />Moore Haven, Florida 2000 2003 <br />h 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Director/Manager: Construction of a 90,000 GPD wastewater treatment plant, <br />2 master pump stations, spray irrigation system, approximately 2 miles of gravity <br />sewer collection system and 2 miles of force main. Services included design, <br />preparation of construction plans and contract documents, permitting, bidding, <br />construction management and observation through project closeout and start-up <br />services as well as assistance in securing funding of the project. <br />