My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Azulejo Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:09:14 PM
Creation date
12/11/2018 3:32:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gib <br /> • inc.com 20200 West Dixie Hwy. Suite 805-A <br /> aZu le <br /> O Aventura, FI 33180 <br /> (305)895-4110 Fax (954) 454-9424 <br /> gcontractor <br /> 01/01/2017 UFAS ADA Upgrades $332,577 Provide accessibility for the Jorge Zaldivar <br /> at Phyllis Wheatley physically impaired standards to 9 (786)469.4129 <br /> and ABE Arronovitz units scattered around two sites. <br /> Buildings. Site accessibility including concrete Jzald@miamidade.g <br /> Miami-Dade Public walkway and ramps connecting ov <br /> Housing and daily use facilities to each unit's <br /> Community front and rear doors. Complete <br /> Development. ADA interior upgrades of all the <br /> Miami, Fl units. <br /> Project Size:Approx. 30,000 SQ <br /> 06/30/2016 Expedited $228,000 The purpose of Expedited Work Lissette Martinez <br /> Maintenance work Order Contract-1 was to complete (786)469.4127 <br /> order contract. emergency miscellaneous calls like: <br /> Miami, Fl unblocking plumbing stoppages, Lissette.Martinez@ <br /> repair/replacement of plumbing miamidade.gov <br /> fixtures, repair/replacement of <br /> light fixtures, switches, outlets, <br /> space heaters, appliance repair <br /> (stoves, refrigerators), roof <br /> patching, interior door <br /> repair/replacement, <br /> repair/replacement of broken glass <br /> and window valances, interior <br /> wall/ceiling patching and painting, <br /> repair/replace flooring, <br /> repair/replace ceramic tile, replace <br /> thresholds and weather seals, <br /> securing kitchen cabinets, cove <br /> base repair/replacement, stair <br /> risers repairs/replacement,tree <br /> trimming, door hardware, <br /> acoustical ceiling tiles replacement, <br /> smoke detectors replacement, etc. <br /> 01/2014 Easterlin Park $908,799.19 Shut-off all existing utilities services Brad Terrier <br /> to Administration to existing building, restroom and (954) 577.4577 <br /> 04/2016 Building. gatehouse. Cap all pipes leading <br /> Oakland Park, Fl into and out of buildings. <br /> bterrier@broward.org <br /> Disconnect electrical service. <br /> Demolition of existing buildings, <br /> including the existing ticket booth, <br /> existing restroom and existing <br /> administration building. <br /> Construction of new building. New <br /> walkways, driveways, and parking <br /> areas. New utility connections. <br /> Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.