Laserfiche WebLink
41b ®� • ;nc.com 20200 West Dixie Hwy. Suite 805-A <br /> aZLIIeJO <br /> Aventura, FI 33180 <br /> (305)895-4110 Fax(954) 454-9424 <br /> general <br /> ® contractor <br /> Relocation of park staff to the new <br /> building.Tie in new building to <br /> existing utilities. Resurfacing of <br /> pavement drives and parking areas. <br /> Irrigation system modification and <br /> landscape restoration. <br /> Project Size: 6,000 SQ <br /> 2013—2018 Vacancy Preparation $5,950.000 Rehabilitation of approximate 500 Lissette Martinez <br /> Contracts No. and Miscellaneous Houses; roof,fascia, shutters, (786)469.4127 <br /> 2,3,4& 6. Repairs. gutters, exterior doors, impact/ <br /> Miami-Dade Public casing windows. Drywall,Tiling, Lissette.Martinez@ <br /> Housing and VCT flooring, painting, plumbing, miamidade.gov <br /> Community electrical , mechanical upgrades . <br /> Development. <br /> Miami, Fl. <br /> 1/01/2015 Various ADA $941,444.00 8 Separate projects located in Jim Federici <br /> Restrooms Markham Park including: (954) 577.4650 <br /> Replacement. -Two new bathroom buildings with <br /> Broward County, Fl scope of work: Engineered masonry JFEDERICI@broward.org <br /> walls, Monolithic, Reinforced <br /> concrete footing, Pre-engineered <br /> wood trusses. Mechanical exhaust <br /> venting of restroom. New electrical <br /> service to the building. Standing <br /> seam metal roof. New drain field <br /> and septic tank. <br /> -ADA bathroom renovations to six <br /> existing buildings with Scope of <br /> work: Demolish existing plumbing <br /> fixtures and exhaust fans. Provide <br /> and install new accessible plumbing <br /> fixtures and new mechanical <br /> exhaust fans and ducts. <br /> Project Size; 16,580 SQ <br /> -1 ADA new bathrooms building in <br /> Easterlin Park. Scope of work: <br /> Remove existing sod and relocate <br /> irrigation heads. <br /> Provide new restroom buildings, <br /> • provide new asphalt ADA driveway <br /> and parking space. Re-lay the sod. <br /> Provide new ADA stainless steel <br /> water cooler. Relocate (1) existing <br /> tree. <br /> Project Size: 7000 SQ. <br /> Page 6 of 10 <br />