My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Azulejo Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:09:14 PM
Creation date
12/11/2018 3:32:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eb <br /> inc.com 20200 West Dixie Hwy. Suite 805-A <br /> azLI <br /> e ® Aventura, FI 33180 <br /> (305)895-4110 Fax(954) 454-9424 <br /> oti <br /> gcontractor <br /> -1 ADA Bathroom renovation to <br /> Tennis Center in C.B. Smith Park. <br /> • Scope of work: Demolish existing, <br /> plumbing fixtures,toilet partitions, <br /> lavatory counter. Provide and <br /> install accessible toilet stall, <br /> lavatory and toilet accessories. <br /> Project Size: 1,156 SQ. <br /> 07/18/2014 Construction of 3 $1,315,300 Construction of Three (3) Multi- Rick Engle <br /> Sports Complex at function Concession buildings and (954)345.2110 <br /> Mullins Park. City of outdoor amenities. Scope of work: <br /> Coral Springs, Fl Provide new concession/restrooms rengle@coralsprings.org <br /> building with new HVAC, Impact <br /> rated doors, windows, louvers, new <br /> fire rated walls and standing seam <br /> metal roof. <br /> Provide new water retention areas, <br /> new sod and modify existing <br /> irrigation. <br /> Provide new pergola with <br /> engineered design. <br /> Provide new ADA ramps, concrete <br /> staircase with handrails. <br /> Provide new asphalt surface, <br /> concrete curbs, new parking area <br /> striping,ADA parking space signage <br /> and driveway signage. <br /> Provide new catch basin. <br /> Project Size:Approx. 15,000 SQ. <br /> 4/24/2014 Security Fencing and $218,924.00 Build new Security Fencing, install Jason Samough <br /> Lighting at Gore lighting, new Landscaping and (305)445.3765 <br /> Building, Fort Irrigation System. jsamough@mcharry.c <br /> Lauderdale, Fl. om <br /> 07/2010 Chert Paving $188,952.00 Replacement of the existing chert Juan Perez <br /> To Replacement at paving; Compaction of existing sub- (305) 926.5611 <br /> 11/2010 Wilkie D. Ferguson base,furnish and install 35,000 sf of <br /> Federal Courthouse, pavers. Removal and Re-installation juan.perez@gsa.gov <br /> Miami, FI of existing precast concrete <br /> benches. <br /> 12/01/2013 Refurbishment of 13 $1,260,721 Complete interior construction of Maria Guillem <br /> Public Bathrooms at 13 public bathrooms within FIU (305)582.3709 <br /> FIU Biscayne Bay North School of Tourism and <br /> Campus. Hospitality Management.Alteration mguillem@fiu.edu <br /> of various area to add new 13 Public <br /> Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.