My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Azulejo Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:09:14 PM
Creation date
12/11/2018 3:32:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` inc.com 20200 West Dixie Hwy. Suite 805-A <br /> azii <br /> lejo Aventura, FI 33180 <br /> (305)895-4110 Fax(954) 454-9424 <br /> general <br /> contractor <br /> Florida International bathrooms, Tie-in Plumbing, <br /> University. Miami Fl Electrical and HVAC to FIU main <br /> service, New Plumbing, Electrical. <br /> HVAC, (including ducts), Fire Alarm, <br /> Walls, Ceiling, Tiling floor and walls, <br /> Doors, Toilet partitions, Installation <br /> of all new fixtures and accessories. <br /> Phased construction comprised of <br /> 10,000 sf. <br /> 4/25/2013 VA Upgrade Finishes $1,375,221 Phased completion of Hospital Steven Dunn <br /> Corridors Floors 1 Corridor Renovation while Hospital (813)4764378 <br /> thru 3. operations fully maintained. Email: <br /> Veteran Hospital Upgrade all finishes at walls,floors, <br /> Miami, Fl ceilings, millwork, Electrical, <br /> plumbing, HVAC, and fire <br /> sprinklers. <br /> Project Size: 15,000 SQ <br /> 2009 Reconfigure Space $745,000 Remove roll-up doors and provide Sherry Dague <br /> in OPS Building. staked concrete masonry units and (305)278.6721 <br /> USCG Miami Beach aluminum window with hurricane sherry.c.dague@usc <br /> Station shutters. New partition walls. g.mil <br /> Supply and install ceramic tile and <br /> base, provide and install acoustical <br /> ceiling grid and tiles. Provide and <br /> install new HVAC system. Provide <br /> and install new hollow metal doors. <br /> Provide and install metal deck with <br /> 2" concrete flooring covered with <br /> VCT and carpet as required, paint <br /> new metal doors, provide new <br /> bond beam and CMU exterior wall <br /> over roll-up doors. Reconfigure 2 <br /> floors bays used as a shop, and <br /> covert into air conditioning 2"d <br /> floor offices. Upgrade all electrical <br /> panels and gas lines. <br /> 2009 Modifications at $450,000 Restoration of Visitors Center, Mike Renard <br /> John Pennekamp Diving Shop, Observatory. Upgrade (850)488.5372 <br /> State Park. bathrooms to ADA compliance, Email: <br /> Key Largo, Fl. Build ADA ramps, railing and <br /> Parking. Replace windows and <br /> build new metal roof at the <br /> bathhouse, Build over 2,000LF of <br /> side walk. <br /> Project Size: 6,100 SQ <br /> Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.