My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2040
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 11:11:10 AM
Creation date
4/11/2013 10:43:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2040
Date (mm/dd/yyyy)
04/09/2013
Description
Approve 3rd Amend/Design-Build Agmt w/ 4M Investors, LLC.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Guaranteed Maximum Price may be modified only as herein provided including possible changes <br />as a result of Extra Work as may be documented in a City Commission approved Change Orderls]. <br />6.2.2 The Guaranteed Maximum Price shall include in the Cost of Work only those taxes <br />which are enacted at the time the Guaranteed Maximum Price is established. <br />6.2.3 The Guaranteed Maximum Price shall include all direct and indirect costs associated <br />with the design and construction phases of the Project, including but not limited to, procurement of <br />materials and equipment, labor, overhead, profits, contingency, permits, insurance, performance <br />and payment bonds, utilities, fees, and taxes. <br />6.3 Administration. <br />6.3.1 The CONTRACTOR shall schedule and conduct weekly meetings at which the <br />CITY and CONTRACTOR, and appropriate Subcontractors can discuss the status of the Work. The <br />CONTRACTOR shall prepare and promptly distribute meeting minutes. <br />6.3.2 The CONTRACTOR shall provide monthly written reports to the CITY and <br />designated consultants on the progress of the entire Work. <br />6.3.3 The CONTRACTOR may develop a system of cost control for the Work, including <br />regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and <br />proposed changes. <br />6.4 Design Responsibilities. <br />6.4.1 CONTRACTOR shall prepare preliminary design documents consisting of <br />preliminary drawings, specifications and other documents to fix and describe the size, quality, <br />quantity and characters of the Work, its architectural, structural, mechanical and electrical systems <br />and the materials and other elements of the Work. <br />6.4.1.1 CONTRACTOR shall submit the preliminary design documents to <br />CITY for review and authorization to proceed with the final design preparation. The <br />CONTRACTOR understands and agrees that the CITY, may at its sole discretion, require changes <br />to the preliminary design. All such changes shall be made at the sole and exclusive cost of the <br />CONTRACTOR and be deemed part of the Guaranteed Maximum Price, except for changes <br />outside the scope of the Work Upon authorization from the CITY to proceed with the <br />commencement of the entire design, CONTRACTOR shall begin to prepare drawings, schedules, <br />specifications, technical criteria, written descriptions, design data, construction documents and <br />diagrams setting forth in detail the requirements for the complete construction of the Work. The <br />preparation of this work shall be done in three phases: 30% thirty percent, 60% sixty percent and <br />90% ninety percent. <br />6.4.1.2 The design services shall be performed by qualified architects, <br />engineers and other professionals duly licensed by the State of Florida and holding current <br />certificates of registration under the laws of the State of Florida. <br />9 <br />SIB BIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.