My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2040
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 11:11:10 AM
Creation date
4/11/2013 10:43:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2040
Date (mm/dd/yyyy)
04/09/2013
Description
Approve 3rd Amend/Design-Build Agmt w/ 4M Investors, LLC.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.1.3 CONTRACTOR shall prepare and submit for review to the CITY a <br />30% design package consisting of drawings and specifications for the site work, foundations, <br />utilities, irrigations systems and other related incidentals. <br />The CONTRACTOR understands and agrees that the CITY, may at its sole <br />discretion, require changes to the 30% percent design. All such changes shall he made at the sole <br />and exclusive cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price, <br />except for changes outside the scope of the Work CONTRACTOR understands and agrees that any <br />information provided to it by the CITY as to any aspect of the Project is not guaranteed. In <br />particular, and without limiting the foregoing disclaimer, identifying the location of existing utilities <br />shall be the CONTRACTOR'S responsibility including identifying the location, character and <br />depth of the existing utilities. Extreme caution shall be exercised by the CONTRACTOR to <br />eliminate any possibility of any damage to utilities resulting from the CONTRACTOR'S activities. <br />Any and all such damage shall be the responsibility, of the CONTRACTOR and all work associated <br />with repairs related to such damage shall be completed to the CrfY'S satisfaction and at the sole <br />and exclusive cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price. <br />The location of all overhead utilities shall be verified. The CONTRACTOR shall be responsible for <br />determining which poles will need shoring during excavation and shall provide such shoring and <br />support as is required. The CITY'S review of the design plans shall not be deemed an acceptance <br />of the plans nor be deemed a pre- approval related to the permitting process that the plans will be <br />required to undergo with the Building Department. <br />6.4.1.4 CONTRACTOR shall prepare and submit for review to the CITY a <br />60% design package consisting of drawings and specifications for the structural, architectural and <br />landscaping portion of the Project. <br />The CONTRACTOR understands and agrees that the CITY, may at its sole <br />discretion, require changes to the 60% percent design. All such changes shall be made at the sole <br />and exclusive cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price, <br />except for changes outside the scope of the Work. CONTRACTOR understands and agrees that <br />any information provided to it by the CfTY as to any aspect of the Project is not guaranteed. The <br />CITY'S review of the design plans shall not be deemed an acceptance of the plans nor be deemed a <br />pre- approval related to the permitting process that the plans will be required to undergo with the <br />Building Department. <br />6.4.1.5 CONTRACTOR shall prepare and submit for review to the CITY a <br />90% design package consisting of drawings and specifications for the mechanical, plumbing, <br />electrical, equipment, instrumentation and all other related work necessary to have a fully functional <br />and completed Project. <br />The CONTRACTOR understands and agrees that the CITY, may at its sole <br />discretion, require changes to the 90% percent design. All such changes shall be made at the sole <br />and exclusive cost of the CONTRACTOR and be deemed part of the Guaranteed Maximum Price, <br />except of changes outside the scope of the Work CONTRACTOR understands and agrees that any <br />information provided to it by the CITY as to any aspect of the Project is not guaranteed. The <br />CITY'S review of the design plans shall not be deemed an acceptance of the plans nor be deemed a <br />m <br />SIB SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.