My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2040
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 11:11:10 AM
Creation date
4/11/2013 10:43:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2040
Date (mm/dd/yyyy)
04/09/2013
Description
Approve 3rd Amend/Design-Build Agmt w/ 4M Investors, LLC.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 20, 2012 <br />Mr. Alan Cohen <br />City Manager <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Proled- 8unny)ates_ Beach — Gatewav Park <br />Dear Mr. Cohen, <br />corporate offloe o 30507.8333 <br />7416 SW 4e1h Street 8 305.667,8870 <br />Wanu. FL 33156 1 USA 21 "'a5®axlbma3.cbm <br />With regards to the above referenced project and pursuant to Issues discussed during our <br />meeting of 03/19/12 and further items discussed during the meetings of 03/02/12; 03/09/12 and <br />03/16/12, we hereby provide a revised Summary for all sddidonal Items submitted for approval <br />( to the Parking Structure Contract (dated 07/21/11) with a revised Total Project Cost amount. <br />I. Move garage building to the east (approx. 20' -0" from west property line) <br />accommodating the future service area at northwest corner of the site — this will be <br />studied during Design Development. <br />2. Fire sprinkler system — Provide cost for a total of four (4) levels. <br />3. Security system - Provide an allowance for conduit prep work in park and garage, <br />4. Restrooms —Total of six (6) stalls for each men and women restroom capacity. <br />5. Fence at north side to be B' -0" high. <br />6. Add an entry walkway at the northeast comer of the park. <br />7. Leave walkway path all around the Great Lawn at 16' -0" wide but do not use any loose <br />gravel and provide pavers and sub - surface compaction to sustain a truck. <br />B. Make Great Lawn 15 feet wider and reduce the length of the north berm — the height of <br />the retaining wall to remain while the slope will be greater. <br />9. Make sure that the daytime and nighttime lighting is In separate circult. <br />10. Incorporate LED lighting — No fluorescent lighting and leave Park Site Lighting doWance <br />at $290,000.00. <br />11. Make sure that the water features have a covered area for pumps and chemical dwage. <br />12. Eliminate small berm and provide a seat wall with stone coping at the south edge of park <br />behind the fence. <br />Corporate Repfatmbbn / AA0002273 <br />Architect Registration / AR14049 <br />SkB <br />EXHIBIT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.